Epic 4, Story 13, Task 6: Update Other Affected Packages
Status: ✅ COMPLETE
Priority: HIGH
Last updated: 2025-12-18 (v0.4.13.6+1 – T06 COMPLETE: All affected packages verified and confirmed updated)
Started: 2025-12-18
Completed: 2025-12-18
Version: v0.4.13.6+1
Code: E4S13T06
Task ID
Format: E\{epic\}:S\{story\}:T\{task\} (e.g., E4:S13:T06)
Full Task ID: E4:S13:T06
Scope
After user verification of the enhanced Kanban board structure, update any other packages that are affected by the Kanban update, based on the system impact assessment from T04.
Package Updates Required:
- Update packages identified in T04 impact assessment as needing updates
- Common packages that may need updates:
- Release Workflow package (if RW needs updates)
- Validator packages (if validators need updates)
- Installer packages (if installers need updates)
- Other packages identified in impact assessment
Dependencies:
- Depends on T01, T02, T03, T04 completion
- Depends on T05 completion (Kanban package updated)
- CRITICAL: Depends on user verification - this task should NOT start until user has verified the enhancement
Input
Prerequisites:
- T01 completed (enhanced Kanban board structure)
- T02 completed (updated Kanban governance policy)
- T03 completed (updated Kanban board template)
- T04 completed (system impact assessment with identified affected packages)
- T05 completed (Kanban package updated)
- User verification obtained - user has reviewed and approved the enhancement
Dependencies:
- E4:S13:T01 – Design and implement MoSCOW prioritized task view in Kanban board
- E4:S13:T02 – Update Kanban governance policy
- E4:S13:T03 – Update Kanban board template
- E4:S13:T04 – Assess system impacts
- E4:S13:T05 – Update Kanban package
- User verification (blocking dependency)
Deliverable
Updated Affected Packages:
-
Updated Packages (Based on T04 Impact Assessment):
- Each package identified in T04 as needing updates
- Updates implemented according to impact assessment
- Packages may include:
- Release Workflow package (if RW needs updates)
- Validator packages (if validators need updates)
- Installer packages (if installers need updates)
- Other packages identified in impact assessment
-
Update Details for Each Package:
- Specific updates documented in T04 impact assessment
- Updates implemented
- Package documentation updated if needed
- Package tested/verified
-
Package Update Summary:
- List of packages updated
- Summary of updates for each package
- Verification that all required updates are complete
Acceptance Criteria
- All packages identified in T04 impact assessment are updated ✅
- Updates implemented according to impact assessment ✅
- Package documentation updated if needed ✅
- Packages tested/verified ✅
- All required updates are complete ✅
- Update summary document created ✅
Approach
-
Review Impact Assessment:
- Review T04 impact assessment document
- Identify all packages that need updates
- Review required updates for each package
- Prioritize updates based on impact assessment
-
Update Each Package:
- For each package identified in impact assessment:
- Review current package implementation
- Implement required updates
- Update package documentation if needed
- Test/verify updates
- For each package identified in impact assessment:
-
Common Package Updates:
-
Release Workflow Package (if needed):
- Update Step 7/8 (Kanban doc updates) if it parses board structure
- Update any scripts that interact with Kanban board
- Update documentation
-
Validator Packages (if needed):
- Update validators that parse Kanban board structure
- Update validation rules if needed
- Update documentation
-
Installer Packages (if needed):
- Update installer scripts if they validate board structure
- Update template copying logic if needed
- Update documentation
-
-
Verify Updates:
- Verify all required updates are complete
- Verify packages are consistent with enhanced board structure
- Verify packages are tested/working
- Create update summary
Dependencies
Depends On:
- E4:S13:T01 – Design and implement MoSCOW prioritized task view in Kanban board
- E4:S13:T02 – Update Kanban governance policy
- E4:S13:T03 – Update Kanban board template
- E4:S13:T04 – Assess system impacts
- E4:S13:T05 – Update Kanban package
- User verification (blocking dependency - MUST have user approval)
Blocks:
- None identified
Blocked By:
- T01, T02, T03, T04, T05 (must have all deliverables)
- User verification (MUST have user approval before starting)
Parallel Development Candidacy: Blocked (depends on all previous tasks and user verification)
Related Work
Related BR/FR Links:
- User request for enhanced Kanban board functionality
Related Tasks:
- E4:S13:T01 – Design and implement MoSCOW prioritized task view
- E4:S13:T02 – Update Kanban governance policy
- E4:S13:T03 – Update Kanban board template
- E4:S13:T04 – Assess system impacts
- E4:S13:T05 – Update Kanban package
Related Stories:
- E2:S01 – RW Agent Execution & Docs (RW package)
- E4:S03 – Kanban + Versioning + RW Integration
Version Anchor
Forensic Marker Format: ✅ COMPLETE (vRC.E.S.T+B) (e.g., ✅ COMPLETE (v0.4.13.6+1))
When Task is Complete:
- Add forensic marker to Task document
- Add forensic marker to Story checklist
- Update version file with task completion
- Update changelog with task completion
Notes
User Verification Requirement:
- This task MUST NOT start until user has verified and approved the enhancement
- User verification is a blocking dependency
- Do not proceed with package updates without user approval
Package Update Principles:
- Only update packages identified in T04 impact assessment
- Implement updates according to impact assessment
- Test/verify updates
- Update documentation if needed
Package Locations:
- Release Workflow:
packages/frameworks/workflow mgt/ - Validators:
packages/frameworks/workflow mgt/scripts/validation/ - Installers:
packages/frameworks/kanban/scripts/ - Other packages: As identified in T04 impact assessment
Update Summary:
- Document which packages were updated
- Document what updates were made
- Document any breaking changes
- Document migration considerations
Completion Summary
Task Status: ✅ COMPLETE (v0.4.13.6+1)
Completed:
-
✅ Release Workflow package updated (v2.1.2) - Completed in T04
- RW doc-init detection bug fixed in
validate_version_bump.py - Documentation updated in
release-workflow-agent-execution.md - Package CHANGELOG, README, and cursorrules updated
- RW doc-init detection bug fixed in
-
✅ All affected packages verified and confirmed updated
-
✅ Package documentation updated
-
✅ All required updates are complete
Note: The Release Workflow package was already updated in T04 (v2.1.2) to fix the doc-init detection bug. No other packages required updates as the Kanban board enhancement is primarily structural and doesn't require changes to validators or installers (they work with the existing structure).
References
docs/knowledge/analysis/kanban-board-enhancement-system-impacts.md- Impact assessment (T04 deliverable)packages/frameworks/workflow mgt/- Release Workflow packagepackages/frameworks/workflow mgt/scripts/validation/- Validator packagespackages/frameworks/kanban/scripts/- Installer packagespackages/frameworks/kanban/- Kanban package (T05 deliverable)