Skip to main content

Story 016 – Kanban Package Implementation Review

Status: COMPLETE
Priority: HIGH
Estimated Effort: [TBD]
Created: 2026-01-18
Last updated: 2026-01-22 (v0.4.16.5+2 – T05: Gap log and risk assessment finalized, all acceptance criteria met)
Version: v0.4.16.5+2
Code: E4S16


Task Checklist

  • E4:S16:T01 – Establish expectations baseline for Kanban package ✅ COMPLETE (v0.4.16.1+1)
  • E4:S16:T02 – Inventory package components and map to expectations ✅ COMPLETE (v0.4.16.2+1)
  • E4:S16:T03 – Validate Kanban behavior against documented guidance ✅ COMPLETE (v0.4.16.3+1)
  • E4:S16:T04 – Review integrations and dependency alignment ✅ COMPLETE (v0.4.16.4+1)
  • E4:S16:T05 – Create gap log and risk assessment ✅ COMPLETE (v0.4.16.5+2 – Gap log and risk assessment finalized, all acceptance criteria met)
  • E4:S16:T06 – Define RC sign-off criteria and remediation tasks ✅ COMPLETE (v0.4.16.6+1)

Overview

This story performs the RC readiness implementation review for the Kanban framework package (packages/frameworks/kanban/).


Expectations Baseline (Draft)

Core operating principles (package README):

  • Kanban can run standalone with Git + Markdown; optional integrations with Numbering & Versioning and Workflow Management.
  • 3-tier structure (Epic → Story → Task) is mandatory; discrete task docs required.
  • Forensic traceability via version markers (vRC.E.S.T+B) and Story Checklist as SoT.
  • Copy, don't reference: consumers must copy the package and customize paths/terminology.

Governance rules (kanban governance policy):

  • All substantive work is task-driven and must map to a task.
  • Every FR/BR results in at least one task.
  • Tasks must live under Stories, Stories under Epics.
  • Versioning must align with Kanban structure and RW validations.

Package composition (README):

  • Governance policy, Epic/Story/Task templates, canonical E/S/T structure docs.
  • Migration utilities and installer (detect → analyze → migrate → validate).
  • Integration guides for versioning and workflows.

Sources:

  • packages/frameworks/kanban/README.md
  • packages/frameworks/kanban/policies/kanban-governance-policy.md

Goal

Provide a complete implementation review, evidence, and remediation plan to support RC sign-off for the Kanban framework.


Tasks

E4:S16:T01 – Establish expectations baseline for Kanban package

Task ID: E4:S16:T01
Status: COMPLETE
Scope: Define the implementation expectations baseline for the Kanban framework package.
Input: Package README, governance policy, templates, and guides.
Deliverable: Expectations baseline documented in this story.
Version Anchor: ✅ COMPLETE (v0.4.16.1+1)

Acceptance Criteria:

  • Expectations baseline documented and approved.
  • Core operating principles captured.
  • Governance rules summarized.
  • Package composition mapped.
  • Sources referenced.

Input: Package README, policies, templates, and guides
Deliverable: Expectations baseline document
Approach: Extract expected behaviors, policies, and structures.

E4:S16:T02 – Inventory package components and map to expectations

Task ID: E4:S16:T02
Status: COMPLETE
Scope: Inventory Kanban package components and map them to expectations baseline.
Input: Package directory inventory.
Deliverable: Component map with expected vs actual coverage.
Version Anchor: ✅ COMPLETE (v0.4.16.2+1)

Acceptance Criteria:

  • Core documentation mapped to expectations baseline.
  • Governance policy and integration guides identified.
  • Scripts and templates cataloged with purpose.
  • Examples and supporting guides accounted for.

Component Inventory (Mapped to Expectations):

  • Core Documentation

    • README.md (package overview, install modes, usage expectations)
    • CHANGELOG.md (version history)
    • MIGRATION_GUIDE_TASK_DOCS.md (task doc migration guidance)
  • Governance & Policy

    • policies/kanban-governance-policy.md (rules and lifecycle)
  • Integration Guidance

    • integration/numbering-versioning-integration.md
    • integration/workflow-management-integration.md
  • FR/BR Intake Guides

    • FR_BR_INTAKE_AGENT_GUIDE.md
    • FR_BR_INTAKE_GUIDE.md
    • FR_BR_INTAKE_QUICK_REFERENCE.md
    • FR_BR_INTAKE_USER_GUIDE.md
    • FR_BR_UXR_FB_GITHUB_SUBMISSION_GUIDE.md
  • Guides & Design Notes

    • guides/portfolio-kanban-alignment-playbook.md
    • docs/agentic-task-creation-workflow-documentation.md
    • design/agentic-fr-br-analysis-workflow-design.md
  • Scripts (Installer, Migration, Agentic Tools)

    • scripts/install_kanban_framework.py, scripts/migrate_structure.py, scripts/validate_installation.py
    • scripts/agentic_mapper.py, scripts/agentic_task_workflow.py, scripts/fr_br_analyzer.py
    • scripts/semantic_matcher.py, scripts/reference_updater.py, scripts/analyze_structure.py
    • scripts/README.md (script usage)
  • Templates

    • templates/ (epic/story/task templates and canonical structures; 900+ files)
  • Examples

    • examples/ (epic, story, task example documents)

Input: Package directory inventory
Deliverable: Component map with expected vs actual coverage
Approach: Map templates, scripts, and docs to expectations.

E4:S16:T03 – Validate Kanban behavior against documented guidance

Input: Policies and board templates
Deliverable: Behavior validation notes and discrepancies
Approach: Validate governance rules and document structure.

E4:S16:T04 – Review integrations and dependency alignment

Input: Integration references across frameworks
Deliverable: Integration alignment report
Approach: Verify ties to versioning and workflow frameworks.

E4:S16:T05 – Create gap log and risk assessment

Task ID: E4:S16:T05
Status: COMPLETE
Scope: Synthesize T01–T04 findings into a consolidated gap log and RC risk assessment for the Kanban framework package.
Input: Findings from T01–T04, BR-034, BR-035, and environment/SOP improvements.
Deliverable: Gap log with severity, likelihood, RC impact, and ownership, plus overall RC risk posture.
Version Anchor: ✅ COMPLETE (v0.4.16.5+1)

E4:S16:T06 – Define RC sign-off criteria and remediation tasks

Input: Gap log and expected behaviors, plus findings from T01–T05
Deliverable: RC sign-off checklist for the Kanban package and remediation task pattern for non-blocking gaps
Approach: Synthesize expectations, inventory, behavior validation, integrations, and the gap log into:

  • A concrete, checkable RC sign-off checklist (governance, structure, integrations, gap posture, traceability)
  • A reusable remediation pattern that wires non-blocking gaps into Kanban/FR/BR tasks without blocking RC

Acceptance Criteria (Story-Level)

  • Expectations baseline documented and approved. ✅ COMPLETE (v0.4.16.1+1)
  • Component inventory mapped to expectations. ✅ COMPLETE (v0.4.16.2+1)
  • Behavioral validation notes captured. ✅ COMPLETE (v0.4.16.3+1)
  • Integration alignment reviewed and documented. ✅ COMPLETE (v0.4.16.4+1)
  • Gap log created with severity levels and RC risk assessment. ✅ COMPLETE (v0.4.16.5+1)
  • RC sign-off criteria and remediation tasks defined; no RC-blocking gaps in the Kanban package. ✅ COMPLETE (v0.4.16.6+1)

Dependencies

  • None (RC readiness prerequisite for Epic 4 package sign-off).

References

  • Package: packages/frameworks/kanban/
  • Kanban governance policies and templates.

Input: Package directory inventory
Deliverable: Component map with expected vs actual coverage
Approach: Map templates, scripts, and docs to expectations.

E4:S16:T03 – Validate Kanban behavior against documented guidance

Input: Policies and board templates
Deliverable: Behavior validation notes and discrepancies
Approach: Validate governance rules and document structure.

E4:S16:T04 – Review integrations and dependency alignment

Input: Integration references across frameworks
Deliverable: Integration alignment report
Approach: Verify ties to versioning and workflow frameworks.

E4:S16:T05 – Create gap log and risk assessment

Input: Findings from T01–T04
Deliverable: Gap log with severity and risk notes
Approach: Consolidate gaps and categorize by RC impact.

E4:S16:T06 – Define RC sign-off criteria and remediation tasks

Input: Gap log and expected behaviors
Deliverable: RC sign-off checklist and remediation task list
Approach: Define minimum bar for RC and backlog tasks.


Acceptance Criteria

  • Expectations baseline documented and approved. ✅ COMPLETE (v0.4.16.1+1)
  • Component inventory mapped to expectations.
  • Behavioral validation notes captured.
  • Integration alignment reviewed and documented.
  • Gap log created with severity levels.
  • RC sign-off criteria and remediation tasks defined.

Dependencies

  • None (RC readiness prerequisite for Epic 4 package sign-off).

References

  • Package: packages/frameworks/kanban/
  • Kanban governance policies and templates.