Story 016 – Kanban Package Implementation Review
Status: COMPLETE
Priority: HIGH
Estimated Effort: [TBD]
Created: 2026-01-18
Last updated: 2026-01-22 (v0.4.16.5+2 – T05: Gap log and risk assessment finalized, all acceptance criteria met)
Version: v0.4.16.5+2
Code: E4S16
Task Checklist
- E4:S16:T01 – Establish expectations baseline for Kanban package ✅ COMPLETE (v0.4.16.1+1)
- E4:S16:T02 – Inventory package components and map to expectations ✅ COMPLETE (v0.4.16.2+1)
- E4:S16:T03 – Validate Kanban behavior against documented guidance ✅ COMPLETE (v0.4.16.3+1)
- E4:S16:T04 – Review integrations and dependency alignment ✅ COMPLETE (v0.4.16.4+1)
- E4:S16:T05 – Create gap log and risk assessment ✅ COMPLETE (v0.4.16.5+2 – Gap log and risk assessment finalized, all acceptance criteria met)
- E4:S16:T06 – Define RC sign-off criteria and remediation tasks ✅ COMPLETE (v0.4.16.6+1)
Overview
This story performs the RC readiness implementation review for the Kanban framework package (packages/frameworks/kanban/).
Expectations Baseline (Draft)
Core operating principles (package README):
- Kanban can run standalone with Git + Markdown; optional integrations with Numbering & Versioning and Workflow Management.
- 3-tier structure (Epic → Story → Task) is mandatory; discrete task docs required.
- Forensic traceability via version markers (
vRC.E.S.T+B) and Story Checklist as SoT. - Copy, don't reference: consumers must copy the package and customize paths/terminology.
Governance rules (kanban governance policy):
- All substantive work is task-driven and must map to a task.
- Every FR/BR results in at least one task.
- Tasks must live under Stories, Stories under Epics.
- Versioning must align with Kanban structure and RW validations.
Package composition (README):
- Governance policy, Epic/Story/Task templates, canonical E/S/T structure docs.
- Migration utilities and installer (detect → analyze → migrate → validate).
- Integration guides for versioning and workflows.
Sources:
packages/frameworks/kanban/README.mdpackages/frameworks/kanban/policies/kanban-governance-policy.md
Goal
Provide a complete implementation review, evidence, and remediation plan to support RC sign-off for the Kanban framework.
Tasks
E4:S16:T01 – Establish expectations baseline for Kanban package
Task ID: E4:S16:T01
Status: COMPLETE
Scope: Define the implementation expectations baseline for the Kanban framework package.
Input: Package README, governance policy, templates, and guides.
Deliverable: Expectations baseline documented in this story.
Version Anchor: ✅ COMPLETE (v0.4.16.1+1)
Acceptance Criteria:
- Expectations baseline documented and approved.
- Core operating principles captured.
- Governance rules summarized.
- Package composition mapped.
- Sources referenced.
Input: Package README, policies, templates, and guides
Deliverable: Expectations baseline document
Approach: Extract expected behaviors, policies, and structures.
E4:S16:T02 – Inventory package components and map to expectations
Task ID: E4:S16:T02
Status: COMPLETE
Scope: Inventory Kanban package components and map them to expectations baseline.
Input: Package directory inventory.
Deliverable: Component map with expected vs actual coverage.
Version Anchor: ✅ COMPLETE (v0.4.16.2+1)
Acceptance Criteria:
- Core documentation mapped to expectations baseline.
- Governance policy and integration guides identified.
- Scripts and templates cataloged with purpose.
- Examples and supporting guides accounted for.
Component Inventory (Mapped to Expectations):
-
Core Documentation
README.md(package overview, install modes, usage expectations)CHANGELOG.md(version history)MIGRATION_GUIDE_TASK_DOCS.md(task doc migration guidance)
-
Governance & Policy
policies/kanban-governance-policy.md(rules and lifecycle)
-
Integration Guidance
integration/numbering-versioning-integration.mdintegration/workflow-management-integration.md
-
FR/BR Intake Guides
FR_BR_INTAKE_AGENT_GUIDE.mdFR_BR_INTAKE_GUIDE.mdFR_BR_INTAKE_QUICK_REFERENCE.mdFR_BR_INTAKE_USER_GUIDE.mdFR_BR_UXR_FB_GITHUB_SUBMISSION_GUIDE.md
-
Guides & Design Notes
guides/portfolio-kanban-alignment-playbook.mddocs/agentic-task-creation-workflow-documentation.mddesign/agentic-fr-br-analysis-workflow-design.md
-
Scripts (Installer, Migration, Agentic Tools)
scripts/install_kanban_framework.py,scripts/migrate_structure.py,scripts/validate_installation.pyscripts/agentic_mapper.py,scripts/agentic_task_workflow.py,scripts/fr_br_analyzer.pyscripts/semantic_matcher.py,scripts/reference_updater.py,scripts/analyze_structure.pyscripts/README.md(script usage)
-
Templates
templates/(epic/story/task templates and canonical structures; 900+ files)
-
Examples
examples/(epic, story, task example documents)
Input: Package directory inventory
Deliverable: Component map with expected vs actual coverage
Approach: Map templates, scripts, and docs to expectations.
E4:S16:T03 – Validate Kanban behavior against documented guidance
Input: Policies and board templates
Deliverable: Behavior validation notes and discrepancies
Approach: Validate governance rules and document structure.
E4:S16:T04 – Review integrations and dependency alignment
Input: Integration references across frameworks
Deliverable: Integration alignment report
Approach: Verify ties to versioning and workflow frameworks.
E4:S16:T05 – Create gap log and risk assessment
Task ID: E4:S16:T05
Status: COMPLETE
Scope: Synthesize T01–T04 findings into a consolidated gap log and RC risk assessment for the Kanban framework package.
Input: Findings from T01–T04, BR-034, BR-035, and environment/SOP improvements.
Deliverable: Gap log with severity, likelihood, RC impact, and ownership, plus overall RC risk posture.
Version Anchor: ✅ COMPLETE (v0.4.16.5+1)
E4:S16:T06 – Define RC sign-off criteria and remediation tasks
Input: Gap log and expected behaviors, plus findings from T01–T05
Deliverable: RC sign-off checklist for the Kanban package and remediation task pattern for non-blocking gaps
Approach: Synthesize expectations, inventory, behavior validation, integrations, and the gap log into:
- A concrete, checkable RC sign-off checklist (governance, structure, integrations, gap posture, traceability)
- A reusable remediation pattern that wires non-blocking gaps into Kanban/FR/BR tasks without blocking RC
Acceptance Criteria (Story-Level)
- Expectations baseline documented and approved. ✅ COMPLETE (v0.4.16.1+1)
- Component inventory mapped to expectations. ✅ COMPLETE (v0.4.16.2+1)
- Behavioral validation notes captured. ✅ COMPLETE (v0.4.16.3+1)
- Integration alignment reviewed and documented. ✅ COMPLETE (v0.4.16.4+1)
- Gap log created with severity levels and RC risk assessment. ✅ COMPLETE (v0.4.16.5+1)
- RC sign-off criteria and remediation tasks defined; no RC-blocking gaps in the Kanban package. ✅ COMPLETE (v0.4.16.6+1)
Dependencies
- None (RC readiness prerequisite for Epic 4 package sign-off).
References
- Package:
packages/frameworks/kanban/ - Kanban governance policies and templates.
Input: Package directory inventory
Deliverable: Component map with expected vs actual coverage
Approach: Map templates, scripts, and docs to expectations.
E4:S16:T03 – Validate Kanban behavior against documented guidance
Input: Policies and board templates
Deliverable: Behavior validation notes and discrepancies
Approach: Validate governance rules and document structure.
E4:S16:T04 – Review integrations and dependency alignment
Input: Integration references across frameworks
Deliverable: Integration alignment report
Approach: Verify ties to versioning and workflow frameworks.
E4:S16:T05 – Create gap log and risk assessment
Input: Findings from T01–T04
Deliverable: Gap log with severity and risk notes
Approach: Consolidate gaps and categorize by RC impact.
E4:S16:T06 – Define RC sign-off criteria and remediation tasks
Input: Gap log and expected behaviors
Deliverable: RC sign-off checklist and remediation task list
Approach: Define minimum bar for RC and backlog tasks.
Acceptance Criteria
- Expectations baseline documented and approved. ✅ COMPLETE (v0.4.16.1+1)
- Component inventory mapped to expectations.
- Behavioral validation notes captured.
- Integration alignment reviewed and documented.
- Gap log created with severity levels.
- RC sign-off criteria and remediation tasks defined.
Dependencies
- None (RC readiness prerequisite for Epic 4 package sign-off).
References
- Package:
packages/frameworks/kanban/ - Kanban governance policies and templates.