Story 017 – Kanban Package Installation Evaluation
Status: ✅ COMPLETE
Priority: HIGH
Estimated Effort: [TBD]
Created: 2026-01-18
Last updated: 2026-01-20 (v0.4.17.6+1 – T06 complete: Documentation gaps captured, Story 017 COMPLETE. UKW sync: 2026-01-20)
Version: v0.4.17.6+1
Code: E4S17
Task Checklist
-
E4:S17:T01 – Enumerate supported installation paths for Kanban ✅ COMPLETE (v0.4.17.1+1)
-
E4:S17:T02 – Validate fresh install steps for each path - ✅ COMPLETE (v0.4.17.2+1)
-
E4:S17:T03 – Validate migration/update paths (if supported) - ✅ COMPLETE (v0.4.17.3+1)
- Task Doc:
T03-validate-migration-update-paths.md
- Task Doc:
-
E4:S17:T04 – Verify post-install configuration and validation steps - ✅ COMPLETE (v0.4.17.4+1)
-
E4:S17:T05 – Document failure modes and rollback guidance - ✅ COMPLETE (v0.4.17.5+1)
-
E4:S17:T06 – Capture documentation gaps and improvements - ✅ COMPLETE (v0.4.17.6+1)
Overview
This story evaluates all installation paths for the Kanban framework package (packages/frameworks/kanban/) to ensure each path is documented, reproducible, and RC-ready.
Installation Paths (Draft)
Primary package installation paths:
- GitHub Releases:
install_package_from_release.py(framework dependency guide). - Git Submodule: copy framework package, then run installer (
install_kanban_framework.py --mode fresh). - CLI Tool (coming soon):
ai-dev-kit install kanban@<version>(placeholder path).
Kanban installer modes (scripts README):
fresh,migration,update,hybrid,canonical_adoption,auto.- Workflow: detect → analyze → select mode → migrate → update refs → validate.
Sources:
INSTALL_IN_YOUR_PROJECT.mdpackages/frameworks/kanban/scripts/README.mdpackages/frameworks/kanban/README.md
Goal
Provide a complete installation evaluation with step-by-step verification, gaps, and remediation tasks for RC sign-off.
Tasks
E4:S17:T01 – Enumerate supported installation paths for Kanban
Task ID: E4:S17:T01
Status: COMPLETE
Scope: Enumerate all supported installation paths and modes for the Kanban package.
Input: Installation guides and scripts.
Deliverable: Installation paths list documented in this story.
Version Anchor: ✅ COMPLETE (v0.4.17.1+1)
Acceptance Criteria:
- Installation paths enumerated (release, submodule, CLI).
- Installer modes listed (fresh, migration, update, hybrid, canonical_adoption, auto).
- Source documents referenced.
Input: Installation guides and scripts
Deliverable: Enumerated installation path list
Approach: Identify release, submodule, and CLI paths (as applicable).
E4:S17:T02 – Validate fresh install steps for each path
Task ID: E4:S17:T02
Status: ✅ COMPLETE
Scope: Validate fresh install steps for each supported installation path to ensure each path is documented, reproducible, and RC-ready.
Input: Installation steps, installation documentation
Deliverable: Step-by-step validation log with results, issues, and recommendations
Approach: Validate each step on a clean environment through documentation review and script analysis.
Version Anchor: ✅ COMPLETE (v0.4.17.2+1)
Acceptance Criteria:
- Path 1 (GitHub Releases) validated with step-by-step log ✅
- Path 2 (Git Submodule) validated with step-by-step log ✅
- Path 3 (CLI Tool) status documented (placeholder/coming soon) ✅
- Validation log created with results for each path ✅
- Issues and gaps documented ✅
- Recommendations provided for RC readiness ✅
E4:S17:T03 – Validate migration/update paths (if supported)
Task ID: E4:S17:T03
Status: ✅ COMPLETE
Scope: Validate migration and update paths for the Kanban framework package to ensure users can successfully migrate existing Kanban structures or update existing framework installations.
Input: Migration/update guidance, migration scripts, documentation
Deliverable: Migration validation notes with results, issues, and recommendations
Approach: Validate each migration/update mode through documentation review and script analysis, verify preserved behavior.
Version Anchor: ✅ COMPLETE (v0.4.17.3+1)
Acceptance Criteria:
- Migration mode validated with step-by-step log ✅
- Update mode validated with step-by-step log ✅
- Hybrid mode validated with step-by-step log ✅
- Canonical adoption mode validated with step-by-step log ✅
- Behavior preservation verified for each mode ✅
- Validation log created with results for each mode ✅
- Issues and gaps documented ✅
- Recommendations provided for RC readiness ✅
E4:S17:T04 – Verify post-install configuration and validation steps
Task ID: E4:S17:T04
Status: ✅ COMPLETE
Scope: Verify post-install configuration and validation steps for the Kanban framework package to ensure users can successfully verify their installation and configure the framework for their project.
Input: README and validation scripts, configuration documentation
Deliverable: Post-install checklist and validation results with recommendations
Approach: Verify configs, validators, and expected outputs through documentation review and script analysis.
Version Anchor: ✅ COMPLETE (v0.4.17.4+1)
Acceptance Criteria:
- Post-install configuration requirements documented ✅
- Configuration scripts validated ✅
- Validation scripts validated ✅
- Post-install checklist created ✅
- Expected outputs documented ✅
- Issues and gaps documented ✅
- Recommendations provided for RC readiness ✅
E4:S17:T05 – Document failure modes and rollback guidance
Task ID: E4:S17:T05
Status: ✅ COMPLETE
Scope: Document failure modes and rollback guidance for the Kanban framework package installation to ensure users can recover from installation failures and rollback problematic installations.
Input: Installer behavior and logs, error handling code, backup mechanisms
Deliverable: Failure mode list and rollback steps with troubleshooting guides
Approach: Capture errors, troubleshooting, and recovery paths through code review and error analysis.
Version Anchor: ✅ COMPLETE (v0.4.17.5+1)
Acceptance Criteria:
- Common failure modes identified and documented ✅
- Error messages documented with meanings ✅
- Rollback procedures created for each failure mode ✅
- Troubleshooting guides created ✅
- Recovery paths documented ✅
- Best practices documented ✅
E4:S17:T06 – Capture documentation gaps and improvements
Task ID: E4:S17:T06
Status: ✅ COMPLETE
Scope: Capture and consolidate all documentation gaps and improvements identified during the Kanban package installation evaluation (T01-T05). Create a comprehensive gap list with remediation tasks to ensure RC readiness.
Input: Findings from T01–T05, gap analysis from each task
Deliverable: Documentation gap list and remediation tasks with RC readiness assessment
Approach: Record missing or unclear instructions, consolidate findings, prioritize gaps, create remediation tasks.
Version Anchor: ✅ COMPLETE (v0.4.17.6+1)
Acceptance Criteria:
- All gaps from T01-T05 consolidated ✅
- Gaps categorized and prioritized ✅
- Remediation tasks created ✅
- RC readiness impact assessed ✅
- Improvement recommendations documented ✅
Acceptance Criteria
- Installation paths enumerated and verified. ✅ COMPLETE (v0.4.17.1+1)
- Fresh install steps documented with results. ✅ COMPLETE (v0.4.17.2+1)
- Migration/update steps validated or explicitly unsupported. ✅ COMPLETE (v0.4.17.3+1)
- Post-install configuration checklist verified. ✅ COMPLETE (v0.4.17.4+1)
- Failure modes and rollback guidance documented. ✅ COMPLETE (v0.4.17.5+1)
- Documentation gaps recorded with remediation tasks. ✅ COMPLETE (v0.4.17.6+1)
Dependencies
- None (RC readiness prerequisite for Epic 4 package sign-off).
References
- Package:
packages/frameworks/kanban/