Task E4:S08:T07 - Task Splitting Across Multiple Canonical Epics (FR-011)
Task ID: E4:S08:T07
Status: IN PROGRESS
Priority: MEDIUM
Feature Request: FR-011
Scope
Implement task-level split planning so mixed-responsibility source epics can map across multiple canonical epics, with explainable decision output and deterministic reference remapping.
Input
- Existing semantic epic matching in Story 008 (FR-009 lineage).
- FR-011 requirements and acceptance criteria.
- ICW-E4S08T07-specification
- ICW-E4S08T07-test-design
- ICW-E4S08T07-implementation-plan
Deliverable
- Multi-epic split evaluator for candidate canonical epic sets.
- Split-plan output with rationale per task assignment.
- Deterministic ID/reference update path for split results.
Acceptance Criteria
- FR-011 FR-1 through FR-6 mapped to implementation steps.
- FR-011 AC-1 through AC-6 covered by tests and examples.
- Task split decisions are explainable and reproducible.
Dependencies
- Depends on: E4:S08 semantic matching baseline.
- Related: FR-009, FR-011.
Links
- Feature Request: FR-011
- Planning artifact: ICW-E4S08T07-specification
- Planning artifact: ICW-E4S08T07-test-design
- Planning artifact: ICW-E4S08T07-implementation-plan