Skip to main content

Epic 4: Kanban Framework

Status: IN PROGRESS
Priority: HIGH
Estimated Effort: [TBD]
Created: 2025-12-02
Last updated: 2026-04-09 (v0.4.8.7+2 – Story 8 Task 7 complete) Branch: epic/4-kanban-framework
Version Schema: 0.4.S.T+B
Production URL: [N/A for this repo]


Story Checklist

  • E4:S01 – Dev Kit Kanban Implementation - COMPLETE ✅ (v0.4.1.1+6)

  • E4:S02 – FR/BR Intake to Tasks - COMPLETE ✅ (v0.4.2.6+3 – All tasks complete: FR/BR/UXR/UAT intake workflow fully implemented)

  • E4:S03 – Kanban + Versioning + RW Integration - COMPLETE ✅ (v0.4.3.7+1)

  • E4:S04 – Kanban Structure Refactoring - COMPLETE ✅ (v0.4.4.1+1)

  • E4:S05 – Canonical Epics for Kanban Framework - COMPLETE ✅ (v0.4.5.1+1)

  • E4:S06 – Comprehensive Canonical Epics/Stories/Tasks Template System - ✅ COMPLETE (v0.4.6.8+1 – All tasks complete)

    • Story: Story-006-comprehensive-canonical-est-template-system.md
    • Tasks: T00 ✅ COMPLETE, T01-T02 ✅ COMPLETE, T03 ✅ COMPLETE, T04 ✅ COMPLETE, T05 ✅ COMPLETE (v0.4.6.5+1), T06 ✅ COMPLETE, T09 ✅ COMPLETE, T10 ✅ COMPLETE, T07 ✅ COMPLETE (v0.4.6.7+1), T08 ✅ COMPLETE (v0.4.6.8+1)
  • E4:S07 – Migration Support and Installation Modes - COMPLETE ✅ (v0.4.7.3+1 – All tasks complete)

  • E4:S08 – Intelligent Epic Matching and Canonical Structure Adoption - COMPLETE ✅ (v0.4.8.6+1 – All tasks complete)

  • E4:S09 – Bug Fixes and Agentic Intelligence Implementation - COMPLETE ✅ (v0.4.9.1+1 – All tasks complete)

    • Story: Story-009-bug-fixes-and-agentic-intelligence.md
    • Tasks: T00 ✅ COMPLETE, T01-T04 ✅ COMPLETE (Bug fixes), T05 ✅ COMPLETE (Threshold removal), T06 ✅ COMPLETE (Agentic intelligence foundation), T07 ✅ COMPLETE (UXR synthesis)
  • E4:S10 – Agentic Kanban Task Creation from FR/BR - ✅ COMPLETE (v0.4.10.7+0 – All tasks complete: Agentic task creation workflow fully implemented)

    • Story: Story-010-agentic-kanban-task-creation-from-fr-br.md
    • Tasks: T00-T07 ✅ COMPLETE (T01: Design workflow, T02: Epic/story mapping, T03: Template-based task creation, T04: Task contextualization, T05: FR/BR intake integration, T06: Agentic intelligence, T07: Documentation and testing)
    • Tasks: T00-T07 TODO (FR-012: Agentic workflow for automatic task creation from FRs/BRs)
  • E4:S11 – Kanban Granularity & Discrete Task Docs - COMPLETE ✅ (v0.4.11.0+0 – Story complete: all tasks done)

    • Story: Story-011-kanban-granularity-discrete-task-docs.md
    • Tasks: T00 ✅ COMPLETE, T01 ✅ COMPLETE (v0.4.11.1+1), T02 ✅ COMPLETE (v0.4.11.2+2), T03 ✅ COMPLETE (v0.4.11.3+1), T04 ✅ COMPLETE (v0.4.11.4+1), T05 ✅ COMPLETE (v0.4.11.5+0), T06 ✅ COMPLETE (v0.4.11.6+2 – All phases: template optimization, guidelines, audit, migration guide)
    • Coordination: Coordinates with E2:S09 (RW integration)
  • E4:S12 – FR/BR/UXR Repository Stories (S00 Pattern) - ✅ COMPLETE (v0.4.12.10+0 – All tasks complete: S00 repository pattern fully implemented and documented)

    • Story: Story-012-fr-br-uxr-repository-stories.md
    • Tasks: T00 ✅ COMPLETE, T01-T10 ✅ COMPLETE (T01: E5:S00 created, T02: E6:S00 created, T03: E7:S00 created, T04: PERPETUAL state defined, T05: Board display logic updated, T06: Intake workflow updated, T07: Versioning policy updated, T08: Meta-grouping pattern documented, T09: Templates updated, T10: Documentation complete)
  • E4:S13 – Kanban Board Enhancement - MoSCOW Prioritized Task View - ✅ COMPLETE (v0.4.13.6+2)

  • E4:S14 – Kanban Framework Maintenance - IN PROGRESS (v0.4.14.1+1 – T01 complete: validate_version_bump perpetual task support)

  • E4:S15 – Procedural Task Template Generation and Hybrid Strategy - IN PROGRESS (v0.4.15.5+2 – T02-T05 complete: Generator design, implementation, integration, documentation, and agentic enhancement)

  • E4:S16 – Kanban Package Implementation Review - COMPLETE ✅ (v0.4.16.5+2 – T05: Gap log and risk assessment finalized, all acceptance criteria met)

  • E4:S17 – Kanban Package Installation Evaluation - ✅ COMPLETE (v0.4.17.6+1 – T06 complete: Documentation gaps captured, Story 017 COMPLETE)

    • Story: Story-017-kanban-package-installation-evaluation.md
    • Tasks: T01 ✅ COMPLETE (v0.4.17.1+1), T02 ✅ COMPLETE (v0.4.17.2+1), T03 ✅ COMPLETE (v0.4.17.3+1), T04 ✅ COMPLETE (v0.4.17.4+1), T05 ✅ COMPLETE (v0.4.17.5+1), T06 ✅ COMPLETE (v0.4.17.6+1)
  • E4:S18 – Kanban Board Info-Only Split - COMPLETE ✅ (v0.4.18.1+2 – Four-way split complete: added kanban-completed.md for historical task tracking, updated all cross-references, system ready for production)

  • E4:S19 – FR/BR/UXR abstract governance and intake - IN PROGRESS (v0.4.19.0+0 — abstract-first; T01 path = stub → E2:S01:T09)


Overview

Epic 4 owns the Kanban framework (packages/frameworks/kanban/) and its concrete application inside this repo:

  • Kanban board under docs/project-management/kanban/_index.md
  • Story files under docs/project-management/kanban/epics/Epic-4/
  • Kanban governance policy for this repo

It ensures that:

  • All substantive work is Task/FR-driven.
  • Kanban, versioning, and RW form a coherent system.
  • FR / BR / UXR have a clear abstract (class-level) governance home in E4:S19 — distinct from concrete report work in E5:S01 / E6:S01 / E7:S00 and delivery stories.

Goals

  1. Implement dev-kit Kanban using the framework

    • Align local Kanban policy with the framework policy.
    • Adopt the FR/BR → Task → Story → Epic rule in practice.
  2. Design FR/BR intake flow

    • Make it easy to go from an incoming Feature Request or Bug Report to:
      • Task(s) under a Story
      • Story under an Epic (creating them when missing)
  3. Clarify Kanban + Versioning + RW integration

    • Show how Tasks map to TASK in versions.
    • Show how RW updates Kanban docs and forensic markers.

Stories (Initial)

Story 1: Dev Kit Kanban Implementation

Status: COMPLETE
Priority: HIGH
Estimated Effort: [TBD]
Last updated: 2026-04-09 (v0.4.8.7+2 – Story 8 Task 7 complete)

Goal:
Fully align the dev-kit Kanban board, stories, and governance policy with the Kanban framework package. Establish ai-dev-kit as the canonical SoT for Kanban policies, templates, and governance.

Tasks:

  • E4:S01:T01 – Review existing dev-kit Kanban policies and templates ✅ COMPLETE (v0.4.1.1+2)
  • E4:S01:T02 – Ingest findings from fynd.deals Epic 15 Kanban work into dev-kit ✅ COMPLETE (v0.4.1.1+3)
  • E4:S01:T03 – Update dev-kit Kanban governance policy as canonical SoT ✅ COMPLETE (v0.4.1.1+4)
  • E4:S01:T04 – Align dev-kit Kanban templates with updated governance ✅ COMPLETE (v0.4.1.1+5)
  • E4:S01:T05 – Document consumption pattern for other projects ✅ COMPLETE (v0.4.1.1+6)

Full story: Story-001-dev-kit-kanban-implementation.md


Story 2: FR/BR Intake to Tasks

Status: COMPLETE
Priority: HIGH
Estimated Effort: [TBD]
Last updated: 2026-04-09 (v0.4.8.7+2 – Story 8 Task 7 complete)

Goal:
Design and implement a clear, actionable flow for converting incoming Feature Requests (FRs) and Bug Reports (BRs) into Kanban Tasks. This story ensures that all work entering the dev-kit is properly structured, tracked, and aligned with the Kanban → Versioning → Release Workflow system.

Tasks:

  • E4:S02:T01 – Analyze current FR/BR intake process and requirements ✅ COMPLETE (v0.4.2.1+1)
  • E4:S02:T02 – Design FR/BR → Task → Story → Epic decision flow ✅ COMPLETE (v0.4.2.2+1)
  • E4:S02:T03 – Create FR/BR intake templates and forms ✅ COMPLETE (v0.4.2.3+1)
  • E4:S02:T04 – Document the intake process with examples ✅ COMPLETE (v0.4.2.4+1)
  • E4:S02:T05 – Create intake workflow guide for agents/users ✅ COMPLETE (v0.4.2.5+1)
  • E4:S02:T06 – GitHub submission integration for FR, BR, and UXR ✅ COMPLETE (v0.4.2.6+1)

Full story: Story-002-fr-br-intake-to-tasks.md


Story 3: Kanban + Versioning + RW Integration

Status: COMPLETE
Priority: HIGH
Estimated Effort: [TBD]
Last updated: 2026-04-09 (v0.4.8.7+2 – Story 8 Task 7 complete)

Goal:
Ensure seamless integration between Kanban, Versioning, and Release Workflow (RW) systems within the dev-kit. This story validates that the three frameworks work together cohesively, providing end-to-end traceability from Feature Requests/Bug Reports through Kanban Tasks to versioned releases.

Tasks:

  • E4:S03:T01 – Review existing integration documentation ✅ COMPLETE (v0.4.3.1+1)
  • E4:S03:T02 – Validate Kanban → Versioning integration in dev-kit ✅ COMPLETE (v0.4.3.2+2)
  • E4:S03:T03 – Validate Versioning → RW integration in dev-kit ✅ COMPLETE (v0.4.3.3+1)
  • E4:S03:T04 – Validate RW → Kanban integration in dev-kit ✅ COMPLETE (v0.4.3.4+1)
  • E4:S03:T07 – Address RW → Kanban integration gaps identified in T004 ✅ COMPLETE (v0.4.3.7+1)
  • E4:S03:T05 – Create dev-kit integration guide ✅ COMPLETE (v0.4.3.5+1)
  • E4:S03:T06 – Document integration examples and edge cases ✅ COMPLETE (v0.4.3.6+1)

Full story: Story-003-kanban-versioning-rw-integration.md


Dependencies

Blocks:

  • Clear, reusable Kanban implementation for dev-kit work.

Blocked By:

  • Epic 1 and Epic 3 for some versioning and core-policy decisions.

Coordinates With:

  • Epic 1: AI Dev Kit Core
  • Epic 2: Workflow Management Framework
  • Epic 3: Numbering & Versioning Framework

References

  • packages/frameworks/kanban/README.md
  • packages/frameworks/kanban/policies/kanban-governance-policy.md
  • docs/project-management/rituals/policy/kanban-governance-policy.md
  • docs/project-management/kanban/_index.md