Skip to main content

Epic 4, Story 12: FR/BR/UXR Repository Stories (S00 Pattern)

Status: COMPLETE ✅
Priority: HIGH
Last updated: 2026-01-05 (v0.4.12.10+0 – All tasks complete: S00 repository pattern fully implemented and documented)
Estimated Effort: 1 week
Started: 2025-12-11
Completed: 2026-01-05
Version: v0.4.12.10+0
Code: E4S12


Task Checklist

  • E4:S12:T00 – Story Creation and FR-021 Intake ✅ COMPLETE (v0.4.12.0+0)
  • E4:S12:T01 – Create Epic 5, Story 0: FR Repo (PERPETUAL) - ✅ COMPLETE (v0.4.12.1+0 – Repository story created: E5:S00)
  • E4:S12:T02 – Create Epic 6, Story 0: BR Repo (PERPETUAL) - ✅ COMPLETE (v0.4.12.2+0 – Repository story created: E6:S00)
  • E4:S12:T03 – Create Epic 7, Story 0: UXR Repo (PERPETUAL) - ✅ COMPLETE (v0.4.12.3+0 – Repository story created: E7:S00)
  • E4:S12:T04 – Update Kanban Policy with PERPETUAL State Definition - ✅ COMPLETE (v0.4.12.4+0 – PERPETUAL state defined in Kanban policy)
  • E4:S12:T05 – Update Board Display Logic to Omit S00 Stories - ✅ COMPLETE (v0.4.12.5+0 – Board display logic updated: S00 stories omitted from epic checklists)
  • E4:S12:T06 – Update Intake Workflow to Assign FR/BR/UXR to S00:Txx - ✅ COMPLETE (v0.4.12.6+0 – Intake workflow updated: repository assignment step added, traceability bridge creation implemented)
  • E4:S12:T07 – Update Versioning Policy with S00 Abstract Space Concept - ✅ COMPLETE (v0.4.12.7+0 – Versioning policy updated: S00 abstract space documented, repository task versioning pattern defined)
  • E4:S12:T08 – Document Meta-Grouping Pattern - ✅ COMPLETE (v0.4.12.8+0 – Meta-grouping pattern documented: implementation stories reference repository tasks by task number)
  • E4:S12:T09 – Update Epic 5, 6, 7 Templates with S00 Pattern - ✅ COMPLETE (v0.4.12.9+0 – Epic templates updated: S00 added to Story Checklist with PERPETUAL status and board display omission notes)
  • E4:S12:T10 – Documentation and Testing - ✅ COMPLETE (v0.4.12.10+0 – Documentation complete: S00 pattern fully documented, templates updated, intake workflow integrated)

Format: E4:S12:Txx (Epic 4, Story 12, Task with 2-digit zero padding)
Forensic Marker Format: ✅ COMPLETE (vRC.E.S.T+B) (e.g., ✅ COMPLETE (v0.4.12.1+1))


Overview

Establish a formal repository pattern for Feature Requests (FRs), Bug Reports (BRs), and User Experience Research (UXR) reports by creating Story 0 (S00) in Epics 5, 6, and 7. Each FR/BR/UXR becomes a task in its respective repository story, creating perfect 1:1 traceability (FR-001 = E5:S00:T01, BR-001 = E6:S00:T01, UXR-001 = E7:S00:T01).


Goals

  • Create repository stories (S00) for FR, BR, UXR
  • Establish 1:1 traceability pattern (FR-001 = E5:S00:T01)
  • Define PERPETUAL state for repository stories
  • Update intake workflow to assign FR/BR/UXR to S00:Txx
  • Update board display logic to omit S00 stories
  • Document meta-grouping pattern

Tasks

E4:S12:T00 – Story Creation and FR-021 Intake

Input: FR-021: FR/BR/UXR Repository Stories (S00 Pattern)
Deliverable: Story document created, FR-021 linked, tasks defined
Dependencies: None
Blocker: None
Parallel Development Candidacy: Safe (documentation only)

Approach:

  1. Read FR-021 and understand requirements
  2. Create Story 12 document under Epic 4
  3. Define tasks based on FR-021 acceptance criteria
  4. Link FR-021 to this story
  5. Update Epic 4 document

Status: ✅ COMPLETE (v0.4.12.0+0)


E4:S12:T01 – Create Epic 5, Story 0: FR Repo (PERPETUAL)

Input: FR-021 requirements, Epic 5 template
Deliverable: Epic 5, Story 0 "FR Repo" created (PERPETUAL)
Dependencies: T00 (Story creation)
Blocker: None
Parallel Development Candidacy: Safe (depends on T00)

Approach:

  1. Create Epic-5/Story-000-fr-repo.md story document
  2. Mark story as PERPETUAL state
  3. Define story purpose: Repository for all Feature Requests
  4. Establish abstract space: v0.5.0.0+0
  5. Document pattern: FR-001 = E5:S00:T01
  6. Update Epic 5 document with S00 in Story Checklist
  7. Add note: S00 omitted from board displays

Acceptance Criteria:

  • Story 0 document created for Epic 5
  • Story marked as PERPETUAL
  • Abstract space v0.5.0.0+0 established
  • Pattern documented: FR-001 = E5:S00:T01
  • Epic 5 document updated with S00

E4:S12:T02 – Create Epic 6, Story 0: BR Repo (PERPETUAL)

Input: FR-021 requirements, Epic 6 template
Deliverable: Epic 6, Story 0 "BR Repo" created (PERPETUAL)
Dependencies: T00 (Story creation)
Blocker: None
Parallel Development Candidacy: Safe (depends on T00, parallel with T01)

Approach:

  1. Create Epic-6/Story-000-br-repo.md story document
  2. Mark story as PERPETUAL state
  3. Define story purpose: Repository for all Bug Reports
  4. Establish abstract space: v0.6.0.0+0
  5. Document pattern: BR-001 = E6:S00:T01
  6. Update Epic 6 document with S00 in Story Checklist
  7. Add note: S00 omitted from board displays

Acceptance Criteria:

  • Story 0 document created for Epic 6
  • Story marked as PERPETUAL
  • Abstract space v0.6.0.0+0 established
  • Pattern documented: BR-001 = E6:S00:T01
  • Epic 6 document updated with S00

E4:S12:T03 – Create Epic 7, Story 0: UXR Repo (PERPETUAL)

Input: FR-021 requirements, Epic 7 template
Deliverable: Epic 7, Story 0 "UXR Repo" created (PERPETUAL)
Dependencies: T00 (Story creation)
Blocker: None
Parallel Development Candidacy: Safe (depends on T00, parallel with T01-T02)

Approach:

  1. Create Epic-7/Story-000-uxr-repo.md story document
  2. Mark story as PERPETUAL state
  3. Define story purpose: Repository for all User Experience Research reports
  4. Establish abstract space: v0.7.0.0+0
  5. Document pattern: UXR-001 = E7:S00:T01
  6. Update Epic 7 document with S00 in Story Checklist
  7. Add note: S00 omitted from board displays

Acceptance Criteria:

  • Story 0 document created for Epic 7
  • Story marked as PERPETUAL
  • Abstract space v0.7.0.0+0 established
  • Pattern documented: UXR-001 = E7:S00:T01
  • Epic 7 document updated with S00

E4:S12:T04 – Update Kanban Policy with PERPETUAL State Definition

Input: Current Kanban policy, PERPETUAL state requirements
Deliverable: Kanban policy updated with PERPETUAL state definition
Dependencies: T01-T03 (repository stories created)
Blocker: None
Parallel Development Candidacy: Safe (depends on T01-T03)

Approach:

  1. Review current Kanban governance policy
  2. Add section: "PERPETUAL State for Repository Stories"
  3. Define PERPETUAL state:
    • Repository stories never complete
    • Excluded from completion analytics
    • Omitted from board displays
    • Still tracked internally
  4. Document S00 pattern:
    • Story 0 (S00) as repository story
    • FR-001 = E5:S00:T01 pattern
    • Abstract space concept
  5. Update policy examples

Acceptance Criteria:

  • PERPETUAL state defined in Kanban policy
  • S00 pattern documented
  • Repository story behavior specified
  • Policy examples updated

E4:S12:T05 – Update Board Display Logic to Omit S00 Stories

Input: Current board display logic, S00 omission requirements
Deliverable: Board views omit E5:S00, E6:S00, E7:S00 from epic checklists
Dependencies: T01-T03 (repository stories created), T04 (policy updated)
Blocker: None
Parallel Development Candidacy: Safe (depends on T01-T04)

Approach:

  1. Review current board display logic:
    • kboard.md (detailed view)
    • _index.md (quick view)
  2. Add omission rules:
    • Epic 5: Omit S00 from story list
    • Epic 6: Omit S00 from story list
    • Epic 7: Omit S00 from story list
  3. Update board display scripts/templates (if any)
  4. Document omission rules in policy
  5. Add note in board views explaining omission

Acceptance Criteria:

  • Board views omit S00 stories from epic checklists
  • Omission rules documented
  • Board display logic updated
  • Notes added explaining omission

E4:S12:T06 – Update Intake Workflow to Assign FR/BR/UXR to S00:Txx

Input: Current intake workflow, S00 assignment requirements
Deliverable: Intake workflow assigns FR/BR/UXR to S00:Txx before implementation assignment
Dependencies: T01-T03 (repository stories created), E2:S11 (intake workflow)
Blocker: None
Parallel Development Candidacy: Safe (depends on T01-T03)

Approach:

  1. Review current intake workflow (E2:S11, E4:S02)
  2. Update intake workflow steps:
    • Step 1: Assign FR/BR/UXR to S00:Txx (repository anchor)
    • Step 2: Analyze content for implementation assignment
    • Step 3: Assign implementation work to appropriate epic/story
    • Step 4: Create traceability bridge (S00:Txx → implementation)
  3. Update intake workflow documentation
  4. Update agent execution guide
  5. Add examples: FR-001 → E5:S00:T01 → E12:S03:T05

Acceptance Criteria:

  • Intake workflow assigns FR/BR/UXR to S00:Txx
  • Repository anchor established before implementation assignment
  • Traceability bridge created
  • Intake workflow documentation updated
  • Examples provided

E4:S12:T07 – Update Versioning Policy with S00 Abstract Space Concept

Input: Current versioning policy, S00 abstract space requirements
Deliverable: Versioning policy updated with S00 abstract space concept
Dependencies: T01-T03 (repository stories created), FR-018 (abstract space concept)
Blocker: None
Parallel Development Candidacy: Safe (depends on T01-T03)

Approach:

  1. Review current versioning policy
  2. Add section: "S00 Abstract Space for Repository Stories"
  3. Document S00 abstract space:
    • E5:S00: v0.5.0.0+0
    • E6:S00: v0.6.0.0+0
    • E7:S00: v0.7.0.0+0
  4. Document task versioning:
    • FR-001 = E5:S00:T01 = v0.5.0.1+0
    • BR-001 = E6:S00:T01 = v0.6.0.1+0
    • UXR-001 = E7:S00:T01 = v0.7.0.1+0
  5. Link to FR-018 (abstract space concept)
  6. Update versioning examples

Acceptance Criteria:

  • S00 abstract space documented in versioning policy
  • Task versioning pattern documented
  • Examples provided
  • Linked to FR-018

E4:S12:T08 – Document Meta-Grouping Pattern

Input: Meta-grouping requirements, current grouping patterns
Deliverable: Meta-grouping pattern documented
Dependencies: T01-T03 (repository stories created)
Blocker: None
Parallel Development Candidacy: Safe (depends on T01-T03)

Approach:

  1. Document meta-grouping pattern:
    • E5:S02 "Authentication Features" → References: E5:S00:T05, T12, T23
    • Task numbers only (no FR numbers)
    • FR traceability via task if needed
  2. Create examples:
    • Grouping story references repository tasks
    • Implementation-focused grouping
    • Traceability maintained via task references
  3. Update Kanban policy with meta-grouping section
  4. Add examples to templates

Acceptance Criteria:

  • Meta-grouping pattern documented
  • Examples provided
  • Policy updated
  • Templates updated

E4:S12:T09 – Update Epic 5, 6, 7 Templates with S00 Pattern

Input: Epic 5, 6, 7 templates, S00 pattern requirements
Deliverable: Epic templates updated with S00 repository story
Dependencies: T01-T03 (repository stories created)
Blocker: None
Parallel Development Candidacy: Safe (depends on T01-T03)

Approach:

  1. Update Epic 5 template:
    • Add S00 "FR Repo" to Story Checklist
    • Mark as PERPETUAL
    • Add note about board display omission
  2. Update Epic 6 template:
    • Add S00 "BR Repo" to Story Checklist
    • Mark as PERPETUAL
    • Add note about board display omission
  3. Update Epic 7 template:
    • Add S00 "UXR Repo" to Story Checklist
    • Mark as PERPETUAL
    • Add note about board display omission
  4. Update template documentation

Acceptance Criteria:

  • Epic 5 template updated with S00
  • Epic 6 template updated with S00
  • Epic 7 template updated with S00
  • Template documentation updated

E4:S12:T10 – Documentation and Testing

Input: All previous tasks, complete implementation
Deliverable: Complete documentation and test coverage
Dependencies: T01-T09 (all previous tasks)
Blocker: None
Parallel Development Candidacy: Safe (depends on all previous tasks)

Approach:

  1. Create comprehensive documentation:
    • S00 repository pattern guide
    • Intake workflow with S00 assignment
    • Meta-grouping examples
    • Board display omission rules
  2. Test repository pattern:
    • Create test FR → Verify E5:S00:Txx assignment
    • Create test BR → Verify E6:S00:Txx assignment
    • Create test UXR → Verify E7:S00:Txx assignment
    • Verify board display omission
    • Verify traceability bridge creation
  3. Test edge cases:
    • Multiple FRs filed simultaneously
    • Intake workflow errors
    • Board display with S00 stories
  4. Update changelog and version markers
  5. Verify all documentation is consistent

Acceptance Criteria:

  • Comprehensive documentation created
  • Test coverage for repository pattern
  • Edge cases tested
  • All documentation verified for consistency

Acceptance Criteria

  • AC1: Epic 5, Story 0 "FR Repo" created (PERPETUAL)
  • AC2: Epic 6, Story 0 "BR Repo" created (PERPETUAL)
  • AC3: Epic 7, Story 0 "UXR Repo" created (PERPETUAL)
  • AC4: Policy: FR-001 = E5:S00:T01, BR-001 = E6:S00:T01, UXR-001 = E7:S00:T01
  • AC5: Intake workflow assigns FR/BR/UXR to S00:Txx before implementation assignment
  • AC6: Repository stories marked PERPETUAL in Kanban policy
  • AC7: Repository stories excluded from completion analytics
  • AC8: Repository stories omitted from epic checklist displays in board views
  • AC9: Repository stories still tracked internally in Epic documents
  • AC10: Meta-grouping supports task number references (E5:S00:T05, T12, T23)

Dependencies

Blocks:

  • Perfect traceability for FRs/BRs/UXRs
  • Formal repository pattern
  • Strengthened intake workflow

Blocked By:

  • None (can be implemented independently)

Related Work:

  • FR-021: FR/BR/UXR Repository Stories (S00 Pattern) (this story)
  • FR-018: Abstract Space for Zero-Numbered E/S/T Docs (S00 abstract space concept)
  • E2:S11: Intake Workflow Automation (intake workflow integration)
  • E4:S02: FR/BR Intake to Tasks (intake foundation)
  • E5, E6, E7: FR/BR/UXR Implementation Epics (repository stories created here)

Completion Summary

[To be filled upon completion]


References

  • FR-021: docs/project-management/kanban/fr-br/FR-021-fr-br-uxr-repository-stories.md
  • FR-018: docs/project-management/kanban/fr-br/FR-018-abstract-space-zero-numbered-est-docs.md
  • E2:S11: docs/project-management/kanban/epics/Epic-2/Story-011-intake-workflow-automation.md
  • E4:S02: docs/project-management/kanban/epics/Epic-4/Story-002-fr-br-intake-to-tasks.md
  • Epic 5 Template: packages/frameworks/kanban/templates/epics/Epic-5-FR-Implementation.md
  • Epic 6 Template: packages/frameworks/kanban/templates/epics/Epic-6-BR-Implementation.md
  • Epic 7 Template: packages/frameworks/kanban/templates/epics/Epic-7-UXR.md
  • Kanban Policy: docs/project-management/rituals/policy/kanban-governance-policy.md

Next Actions

  • Begin T01: Create Epic 5, Story 0: FR Repo
  • Create Epic 6, Story 0: BR Repo (T02)
  • Create Epic 7, Story 0: UXR Repo (T03)
  • Update Kanban policy with PERPETUAL state (T04)