Story 018 – Kanban Board Info-Only Split
Status: COMPLETE ✅
Priority: HIGH
Estimated Effort: [TBD]
Created: 2026-01-20
Last updated: 2026-03-09 (RW: E4:S18:T01+2 – Four-way split complete: added kanban-completed.md for historical task tracking, updated all cross-references, system ready for production)
Version: v0.4.18.1+2
Code: E4S18
Task Checklist
-
E4:S18:T01 – Implement Kanban Board Info-Only Split - ✅ COMPLETE (v0.4.18.1+1)
-
E4:S18:T02 – Upgrade Packaged Kanban Framework Board Split - ✅ COMPLETE (v0.4.18.2+1)
Overview
Split the Kanban board into two documents: structured information only (kboard.md) and rules/explanations (kanban-board-guide.md). This reduces cognitive load when skimming the board by removing all non-informational content.
Goals
- Create
kanban-board-guide.mdwith all rules, explanations, and how-to content - Strip
kboard.mdto structured information only (tasks, epics, status, links) - Add cross-references between documents
- Update templates and governance policy to reflect the split (T02)
Implementation Notes
- The three-way split reduces cognitive load while maintaining comprehensive project management
- Each document serves a specific purpose: tasks (MoSCOW), structure (hierarchy), rules (guidance)
- Cross-references between documents ensure navigation and context preservation
- Framework templates updated to generate three-way split for new installations
Tasks
E4:S18:T01 – Implement Kanban Board Info-Only Split
Input: Current kboard.md, FR-036 requirements
Deliverable: Split board documents, updated templates, updated policy
Approach: Create guide doc, migrate explanatory content, strip board to info-only, update references
Acceptance Criteria
-
kboard.mdcontains ONLY structured information (no explanatory text) -
kanban-board-guide.mdcontains all rules, explanations, and how-to content - Cross-references between documents are clear
- Templates and policy updated to reflect split
Dependencies
Related Work:
- FR-036: Kanban Board Info-Only Split
- E4:S13: Kanban Board Enhancement - MoSCOW Prioritized Task View (board structure foundation)
References
- FR-036:
docs/project-management/kanban/fr-br/FR-036-kanban-board-info-only-split.md - Current Board:
docs/project-management/kanban/kboard.md - Board Template:
packages/frameworks/kanban/templates/KANBAN_BOARD_TEMPLATE.md