Skip to main content

AI Dev Kit – Kanban Completed Tasks

Last Updated: 2026-04-19 (E5:S09:T11 complete — BR-068 monorepo MDX links) Version: v0.5.9.11+5 (from version.py at RW E5:S09:T11)

For MoSCOW prioritized tasks, see: kboard.md
For completed FR/BR/UXR intake items, see: fr-br-uxr-completed.md
For Epic/Story/Task structure, see: kanban-structure.md
For rules and explanations, see: kanban-board-guide.md


20 Most Recently Completed Tasks

Epic 5: Documentation Management (Story 9 — Docusaurus Documentation Portal)

  • E5:S09:T11BR-068 monorepo cross-root Markdown / MDX link resolution (IPW-E5S09T11 Waves 1–4); portal strict production build green; BR-068 COMPLETE.
    Completed: 2026-04-19T23:59:00Z | Version: v0.5.9.11+5 | Agent: RW Agent

Epic 6: Framework Management (Story 9 — Installation and adopter integration)

  • E6:S09:T01FR-080 end-to-end greenfield installation: spec + install_greenfield_path.py + INSTALL/user-docs + Wave 4 validators / reference transcript + Wave 5 FR/T01/IPW traceability; FR-080 IMPLEMENTED.
    Completed: 2026-04-19T17:10:00Z | Version: v0.6.9.1+8 | Agent: RW Agent

Epic 7: Codebase Maintenance (Story 6 — Post-Windsurf Project Review)

  • E7:S06:T18UXR-007 interactive installer Kanban pattern / prompt clarity; publication-aligned ICW split; RW v0.7.6.18+3 (task-touch SemVer traceability).
    Completed: 2026-04-18T15:23:00Z | Version: v0.7.6.18+3 | Agent: RW Agent

Epic 2: Workflow Management Framework (Story 15 — IPW governance and publication contract)

  • E2:S15:T01BR-066 IPW Docusaurus filing contract, deterministic validator, backfill inventory.
    Completed: 2026-04-14T16:04:00Z | Version: v0.2.15.1+1 | Agent: RW Agent

Epic 2: Workflow Management Framework (Story 1 — RW agent execution)

  • E2:S01:T13BR-063: RW -k task attribution drift — forensic-strict mismatch guard, --art adoption path, validate_version_bump alignment, workflow_orchestrator parsing, regression tests, .cursorrules + portable excerpt + RW agent execution doc updates.
    Completed: 2026-04-07T15:52:33Z | Version: v0.2.1.13+2 | Agent: RW Agent

Epic 6: Framework Management (Story 6 — feature requests)

  • E6:S06:T57BR-039 repo implementation COMPLETE: traceability, evidence, Cursor-only maintainer policy, no Windsurf verification obligation (no subscription); BR-039 stays IN PROGRESS for Cascade vendor/product.
    Completed: 2026-04-02T16:00:00Z | Version: v0.6.6.57+6 (RW -k repair) | Agent: RW Agent

Epic 5: FR Repo (repository story)

  • E5:S01:T75ICW durable planning artifacts in repo documentation (FR-075): specification-and-planning-artifacts-policy.md, docs/implementation-cycles/README.md, ICW framework README + guide, icw-workflow.yaml comment, .cursorrules; intake FR-075 + board row.
    Completed: 2026-04-01T15:46:20Z | Version: v0.5.1.75+1 | Agent: RW Agent

Epic 5: Documentation Management

  • E5:S09:T10 – Docusaurus strict broken anchors (onBrokenAnchors: 'throw') post–T08 (FR-067 FU-3): corpus anchor/heading alignment, portal/docusaurus.config.js, portal/README.md, tests/test_portal_fr067_build_triage.py; filing v0.5.9.10+1; implementation v0.5.9.10+2 (RW E5:S09:T10).
    Completed: 2026-04-01T15:17:58Z | Version: v0.5.9.10+2 | Agent: RW Agent

Epic 2: Workflow Management Framework

  • E2:S11:T12 – GitHub Actions intake (BR-053) — COMPLETE (workaround, v0.2.11.12+2) — workflow unregistered (fr-br-intake.yml.DISABLED); manual intake; closure per BR-053 Resolution / current status (not a vendor trigger fix)
    Completed: 2026-03-30T16:00:00Z | Version: v0.2.11.12+2 | Agent: UKW / Maintainer

Epic 5: Documentation Management

  • E5:S09:T09 – GitHub Pages go-live (FR-070 follow-up): epic/5main, Actions run 23796236180 green, Pages legacy gh-pages//, canonical HTTP 200, portal/README.md go-live/troubleshooting; task doc Task ID for RW validators; init v0.5.9.9+1 (RW -k), release v0.5.9.9+2 (RW E5:S09:T09).
    Completed: 2026-03-31T12:10:00Z | Version: v0.5.9.9+2 | Agent: RW Agent

  • E5:S09:T08 – Docusaurus strict broken links (throw) post–FR-067 (FU-1 closed): corpus link remediation, portal/docusaurus.config.js, portal/README.md, tests/test_portal_fr067_build_triage.py; init v0.5.9.8+1 (RW -k), implementation v0.5.9.8+2; merged epic/5main.
    Completed: 2026-04-01T14:30:00Z | Version: v0.5.9.8+2 | Agent: RW Agent

  • E5:S09:T07 – Docusaurus site search (FR-071): @easyops-cn/docusaurus-search-local in portal/docusaurus.config.js, portal/README.md (smoke queries, privacy, build time), tests/test_portal_fr071_search.py
    Completed: 2026-03-30T16:59:05Z | Version: v0.5.9.7+1 | Agent: RW Agent

  • E5:S09:T06 – Docusaurus GitHub Pages deployment (FR-070): .github/workflows/docusaurus-deploy.yml, portal hosting README, root README link, tests/test_portal_fr070_deployment.py
    Completed: 2026-03-30T16:11:41Z | Version: v0.5.9.6+1 | Agent: RW Agent

  • E5:S09:T05 – Docusaurus CI build gate (FR-069): .github/workflows/docusaurus-build.yml, tests/test_portal_fr069_ci.py, portal README CI pointer
    Completed: 2026-03-30T15:52:14Z | Version: v0.5.9.5+1 | Agent: RW Agent

  • E5:S09:T04 – Docusaurus navigation / sidebar IA / landing (FR-068): portal/sidebars.js, portal/docusaurus.config.js, homepage, tests/test_portal_fr068_navigation.py, portal README mapping + --no-minify build workaround
    Completed: 2026-03-30T15:27:28Z | Version: v0.5.9.4+1 | Agent: RW Agent

  • E5:S09:T03 – Docusaurus production build corpus triage (FR-067): MDX/placeholder escapes, onBrokenLinks/onBrokenMarkdownLinks policy, scripts/escape_mdx_placeholders.py, tests/test_portal_fr067_build_triage.py, docs/maintenance/docusaurus-corpus-triage-fr-067.md
    Completed: 2026-03-30T22:30:00Z | Version: v0.5.9.3+1 | Agent: RW Agent

  • E5:S09:T02 – Canonical docs/ path and publish scope (FR-066): portal/docusaurus.config.js, portal/README.md, tests/test_portal_fr066_docs_path.py, docs/documentation/docusaurus-portal-index.md
    Completed: 2026-03-30T21:45:00Z | Version: v0.5.9.2+2 | Agent: RW Agent

  • E5:S09:T01 – Docusaurus site identity (FR-065): portal/docusaurus.config.js, portal/README.md, tests/test_portal_fr065_identity.py
    Completed: 2026-03-30T20:35:00Z | Version: v0.5.9.1+2 | Agent: RW Agent

  • E5:S01:T69 – Retire shields branch (FR-064): delete update-badges.yml BYOB; README static-badge policy; git push origin --delete shields
    Completed: 2026-03-30T12:44:00Z | Version: v0.5.1.69+1 | Agent: RW Agent

  • E5:S01:T68 – Packaged frameworks — rw-config/scripts_path consumer doc; packages README semver policy; numbering + kanban README (FR-060 triggers / paths)
    Completed: 2026-03-30T12:15:00Z | Version: v0.5.1.68+2 | Agent: RW Agent

  • E5:S01:T67 – Adopter install docs — mandatory RW + task id same message (FR-060); INSTALL + user-docs + workflow mgt README + package install cross-ref
    Completed: 2026-03-30T11:29:20Z | Version: v0.5.1.67+2 | Agent: RW Agent

  • E5:S01:T66.cursorrules vs packaged RW trigger parity (parity doc; excerpt 1b/1c/1d todos; FR citations; root dual-source link)
    Completed: 2026-03-30T10:48:54Z | Version: v0.5.1.66+2 | Agent: RW Agent

  • E5:S01:T65 – Align workflow mgt README with registry count (11 + workflow-registry.yaml SoT; Specialized (4); no phantom Documentation Workflow)
    Completed: 2026-03-30T10:40:14Z | Version: v0.5.1.65+2 | Agent: RW Agent

  • E5:S01:T63 – RW Task Argument Requirement / FR-060 (strict task token; validate_rw_task_complete.py; docs; T63 renumber; find_story_file fr-repo preference)
    Completed: 2026-03-25T16:26:47Z | Version: v0.5.1.63+1 | Agent: RW Agent

Epic 7: Codebase Maintenance

  • E7:S06:T09 – Config and git state validation (rw-config path matrix; version vs branch; git baseline; .cursorrules vs config; .cursorignore absent; Story 6 COMPLETE)
    Completed: 2026-03-25T15:15:34Z | Version: v0.7.6.9+1 | Agent: RW Agent

  • E7:S06:T08 – Dependency and tooling audit (setup.py vs requirements; pytest 85/92; CI Tests gap; BR-058; test_validation aligned)
    Completed: 2026-03-25T15:00:00Z | Version: v0.7.6.8+1 | Agent: RW Agent

  • E7:S06:T07 – General documentation and cross-reference integrity (README path spot-check; docs tree; fr-br (epics/ re-scan clean; audit in T07 doc)
    Completed: 2026-03-25T14:34:13Z | Version: v0.7.6.7+1 | Agent: RW Agent

  • E7:S06:T06 – FR/BR/UXR intake documentation quality (aggregate doc audit; ../epics/ link fixes in nine fr-br files; cross-links kanban vs FR/BR/UXR completed)
    Completed: 2026-03-25T14:30:53Z | Version: v0.7.6.6+1 | Agent: RW Agent

  • E7:S06:T05 – Workflow script integrity (ukw_syntax_parser, task_inference, orchestrator/executor; canonical_steps + test fixes; no BR filed)
    Completed: 2026-03-25T14:25:32Z | Version: v0.7.6.5+1 | Agent: RW Agent

  • E7:S06:T04 – Recent commit review (last ~15 commits: RW compliance, batch scope, quality; no BR/FR filed)
    Completed: 2026-03-25T14:17:31Z | Version: v0.7.6.4+1 | Agent: RW Agent

  • E7:S06:T03 – Kanban documentation consistency (live SoT, E9/E18 disambiguation, cross-refs, Epic-9 S05 stub)
    Completed: 2026-03-25T12:00:00Z | Version: v0.7.6.3+1 | Agent: Cursor-Agent


Epic 6: Framework Management and Maintenance

  • E6:S06:T56 – RW ambiguous task identifier typo risk (BR-056 verified)
    Completed: 2026-03-25T12:55:31Z | Version: v0.6.6.56+4 | Agent: RW Agent

🚀 Latest Releases (Today - 2026-03-12)

📋 Batch Release: 8 Should Have Tasks via RW Execution


Epic 11: Debugging and Troubleshooting

  • E11:S01:T01 – Debug path expectations baseline
    Completed: 2026-03-12T14:00:00Z | Version: v0.11.1.1+1 | Agent: PM-AGENT-001

Epic 10: Documentation and Knowledge Management

  • E10:S01:T01 – Doc lifecycle expectations baseline
    Completed: 2026-03-12T14:00:00Z | Version: v0.10.1.1+1 | Agent: PM-AGENT-001

Epic 8: Tooling & Automation

  • E8:S04:T01 – Tooling & Automation expectations baseline
    Completed: 2026-03-12T14:00:00Z | Version: v0.8.4.1+1 | Agent: PM-AGENT-001

Epic 1: AI Dev Kit Core

  • E1:S06:T01 – Set up BYOB badges for private repository
    Completed: 2026-03-12T14:00:00Z | Version: v0.1.6.1+1 | Agent: PM-AGENT-001

Epic 6: Framework Management and Maintenance

  • E6:S07:T18 – Tool-Agnostic Workflow Step Tracking + Persisted Run Logs
    Completed: 2026-03-12T14:00:00Z | Version: v0.6.7.18+1 | Agent: PM-AGENT-001

Epic 4: Kanban Framework

  • E4:S11:T07 – Migrate Embedded Tasks to Discrete Task Documents
    Completed: 2026-03-12T14:00:00Z | Version: v0.4.11.7+1 | Agent: PM-AGENT-001

Epic 6: Framework Management and Maintenance

  • E6:S07:T106 – Windsurf Migration: .cursorrules to Workflow Equivalents
    Completed: 2026-03-12T14:00:00Z | Version: v0.6.7.106+1 | Agent: PM-AGENT-001

Epic 7: Codebase Maintenance and Review

  • BR-052 – GitHub Actions Workflow Optimization
    Completed: 2026-03-12T11:09:00Z | Version: v0.7.1.5+4 | Agent: RW Agent

Epic 7: Codebase Maintenance and Review

  • E7:S01:T06 – Implement Update Changelog Workflow (UCW)
    Completed: 2026-03-16T17:00:00Z | Version: v0.7.1.7+4 | Agent: RW Agent

Epic 7: Codebase Maintenance and Review

  • E7:S01:T07 – Markdown Maintenance Workflow (MMW)
    Completed: 2026-03-16T17:30:00Z | Version: v0.7.1.7+4 | Agent: RW Agent

Epic 7: Codebase Maintenance and Review

  • E7:S01:T08 – Task Doc Naming Standardization
    Completed: 2026-03-16T17:45:00Z | Version: v0.7.1.8+4 | Agent: RW Agent

Epic 7: Codebase Maintenance and Review

  • E7:S01:T09 – Kanban Template Governance & UXR Ownership
    Completed: 2026-03-16T17:45:00Z | Version: v0.7.1.9+4 | Agent: RW Agent

📅 Recent Completions (Yesterday - 2026-03-11)

Epic 6: Framework Management and Maintenance

  • E6:S07:T108 – UKW Extension for FR/BR/UXR Temporal Tracking and Synchronization
    Completed: 2026-03-11T17:15:00Z | Version: v0.6.7.108+1 | Agent: RW Agent

Epic 6: Framework Management and Maintenance

  • E6:S06:T02 – Fix Release Workflow Micromanagement Issues
    Completed: 2026-03-11T16:45:00Z | Version: v0.6.6.2+8 | Agent: Documentation Agent

Epic 5: Framework Management and FR Repository

  • E5:S01:T49 – Enhanced kanban-completed.md with Timestamps and Recent Tasks
    Completed: 2026-03-11T16:30:00Z | Version: v0.5.1.49+2 | Agent: Documentation Agent

Epic 5: Framework Management and FR Repository

  • E5:S01:T48 – ICW Task Identifier Argument
    Completed: 2026-03-11T16:20:00Z | Version: v0.5.1.48+1 | Agent: Documentation Agent

Epic 6: Framework Management and Maintenance

  • E6:S06:T42 – Fix UKW Agent Board Cleanup Failure
    Completed: 2026-03-11T16:15:00Z | Version: v0.6.6.41+1 | Agent: Documentation Agent

Epic 6: Framework Management and Maintenance

  • E6:S06:T999 – Board Cleanup Test Task
    Completed: 2026-03-11T16:10:00Z | Version: v0.6.6.41+1 | Agent: Documentation Agent

Epic 6: Framework Management and Maintenance

  • E6:S06:T41 – Windsurf: Investigate how to leverage AGENTS.md and SKILL.md for workflows
    Completed: 2026-03-11T16:05:00Z | Version: v0.6.6.41+1 | Agent: Documentation Agent

Epic 6: Framework Management and Maintenance

  • E6:S06:T03 – Investigate Apple SDK License Blocking Issue
    Completed: 2026-03-11T16:00:00Z | Version: v0.6.6.3+1 | Agent: Documentation Agent

Epic 5: Framework Management and FR Repository

  • E5:S01:T37 – Kanban Policy Task Prioritisation and Queue/Stack
    Completed: 2026-03-11T15:55:00Z | Version: v0.5.1.37+3 | Agent: Documentation Agent

Epic 5: Framework Management and FR Repository

  • E5:S01:T36 – RW Update Kanban Board on Task Completion
    Completed: 2026-03-11T15:50:00Z | Version: v0.5.1.36+1 | Agent: Documentation Agent

Epic 5: Framework Management and FR Repository

  • E5:S01:T34 – UKW Granular Control and Use Case Flags
    Completed: 2026-03-11T15:45:00Z | Version: v0.5.1.34+1 | Agent: Documentation Agent

Epic 4: Kanban Framework

  • E4:S13:T06 – Update other affected packages (MoSCOW board workstream)
    Completed: 2025-12-15T14:00:00Z | Version: v0.4.13.6+2 | Agent: Documentation Agent

Epic 4: Kanban Framework

  • E4:S05:T01 – Create canonical Epic structure
    Completed: 2025-11-05T16:00:00Z | Version: v0.4.5.1+1 | Agent: Documentation Agent

Epic 4: Kanban Framework

  • E4:S04:T01 – Refactor board structure
    Completed: 2025-11-01T16:00:00Z | Version: v0.4.4.1+1 | Agent: Documentation Agent

Overview

This document tracks all completed tasks across the AI Dev Kit project. Tasks are organized by Epic and Story, with completion dates and version markers for forensic tracking.

Completion Criteria: A task is marked COMPLETE only when:

  • Implementation is fully done (code or docs delivered, released in a version)
  • Sign-off is obtained (validated, accepted by the responsible party)

Completed Tasks by Epic

Epic 1: AI Dev Kit Core ✅ COMPLETE

Status: COMPLETE
Completed: 2025-12-02
Version: v0.1.2.5+1

Story 001: AI Dev Kit Kanban and Versioning ✅ COMPLETE

  • E1:S01:T01 – Create Kanban board structure - ✅ COMPLETE (v0.1.1.1+1)
  • E1:S01:T02 – Implement versioning schema - ✅ COMPLETE (v0.1.1.2+1)
  • E1:S01:T03 – Create governance policies - ✅ COMPLETE (v0.1.1.3+1)
  • E1:S01:T04 – Create task tracking system - ✅ COMPLETE (v0.1.1.4+1)
  • E1:S01:T05 – Create documentation framework - ✅ COMPLETE (v0.1.1.5+1)
  • E1:S01:T06 – Integrate with versioning - ✅ COMPLETE (v0.1.1.6+1)

Story 002: Package and Repo Architecture ✅ COMPLETE

  • E1:S02:T01 – Analyze current package structure - ✅ COMPLETE (v0.1.2.1+1)
  • E1:S02:T02 – Document modularity principles - ✅ COMPLETE (v0.1.2.2+1)
  • E1:S02:T03 – Create package dependency matrix - ✅ COMPLETE (v0.1.2.3+1)
  • E1:S02:T04 – Document consumption patterns - ✅ COMPLETE (v0.1.2.4+1)
  • E1:S02:T05 – Update package READMEs - ✅ COMPLETE (v0.1.2.5+1)

Story 003: Core Infrastructure ✅ COMPLETE

  • E1:S03:T01 – Establish project structure - ✅ COMPLETE (v0.1.3.1+1)
  • E1:S03:T02 – Create build system - ✅ COMPLETE (v0.1.3.2+1)
  • E1:S03:T03 – Implement testing framework - ✅ COMPLETE (v0.1.3.3+1)

Epic 3: Numbering & Versioning Framework ✅ COMPLETE

Status: COMPLETE
Completed: 2025-12-04
Version: v0.3.3.3+1

Story 001: Versioning Schema Design ✅ COMPLETE

  • E3:S01:T01 – Design RC.EPIC.STORY.TASK+BUILD schema - ✅ COMPLETE (v0.3.1.1+1)
  • E3:S01:T02 – Create versioning policies - ✅ COMPLETE (v0.3.1.2+1)
  • E3:S01:T03 – Implement version tracking - ✅ COMPLETE (v0.3.1.3+1)

Story 002: Numbering System ✅ COMPLETE

  • E3:S02:T01 – Create Epic/Story/Task numbering - ✅ COMPLETE (v0.3.2.1+1)
  • E3:S02:T02 – Implement build numbering - ✅ COMPLETE (v0.3.2.2+1)

Story 003: Integration Framework ✅ COMPLETE

  • E3:S03:T01 – Integrate with Kanban - ✅ COMPLETE (v0.3.3.1+1)
  • E3:S03:T02 – Integrate with Release Workflow - ✅ COMPLETE (v0.3.3.2+1)
  • E3:S03:T03 – Create version validation - ✅ COMPLETE (v0.3.3.3+1)

Epic 4: Kanban Framework 🔄 IN PROGRESS

Status: IN PROGRESS
Priority: HIGH
Last Updated: 2026-03-09 (RW: E4:S18:T01+1)

Completed Stories ✅

Story 001: Dev Kit Kanban Implementation ✅ COMPLETE (v0.4.1.1+6)

  • E4:S01:T01 – Create Kanban board structure - ✅ COMPLETE (v0.4.1.1+1)
  • E4:S01:T02 – Implement MoSCOW prioritization - ✅ COMPLETE (v0.4.1.2+1)
  • E4:S01:T03 – Create task tracking system - ✅ COMPLETE (v0.4.1.3+1)
  • E4:S01:T04 – Implement governance policies - ✅ COMPLETE (v0.4.1.4+1)
  • E4:S01:T05 – Create documentation framework - ✅ COMPLETE (v0.4.1.5+1)
  • E4:S01:T06 – Integrate with versioning - ✅ COMPLETE (v0.4.1.6+1)

Story 002: FR/BR Intake to Tasks ✅ COMPLETE (v0.4.2.6+3)

  • E4:S02:T01 – Create FR/BR templates - ✅ COMPLETE (v0.4.2.1+1)
  • E4:S02:T02 – Implement intake workflow - ✅ COMPLETE (v0.4.2.2+1)
  • E4:S02:T03 – Create task generation system - ✅ COMPLETE (v0.4.2.3+1)
  • E4:S02:T04 – Implement Epic/Story matching - ✅ COMPLETE (v0.4.2.4+1)
  • E4:S02:T05 – Create validation system - ✅ COMPLETE (v0.4.2.5+1)
  • E4:S02:T06 – Add GitHub integration - ✅ COMPLETE (v0.4.2.6+3)

Story 003: Kanban + Versioning + RW Integration ✅ COMPLETE (v0.4.3.7+1)

  • E4:S03:T01 – Integrate versioning with Kanban - ✅ COMPLETE (v0.4.3.1+1)
  • E4:S03:T02 – Integrate RW with Kanban - ✅ COMPLETE (v0.4.3.2+2)
  • E4:S03:T03 – Create synchronization system - ✅ COMPLETE (v0.4.3.3+1)
  • E4:S03:T04 – Implement automated updates - ✅ COMPLETE (v0.4.3.4+1)
  • E4:S03:T05 – Create dev-kit integration guide - ✅ COMPLETE (v0.4.3.5+1)
  • E4:S03:T06 – Document integration examples - ✅ COMPLETE (v0.4.3.6+1)
  • E4:S03:T07 – Address integration gaps - ✅ COMPLETE (v0.4.3.7+1)

Story 004: Kanban Structure Refactoring ✅ COMPLETE (v0.4.4.1+1)

  • E4:S04:T01 – Refactor board structure - ✅ COMPLETE (v0.4.4.1+1)

Story 005: Canonical Epics for Kanban Framework ✅ COMPLETE (v0.4.5.1+1)

  • E4:S05:T01 – Create canonical Epic structure - ✅ COMPLETE (v0.4.5.1+1)

Story 006: Comprehensive Canonical EST Template System ✅ COMPLETE (v0.4.6.8+1)

  • E4:S06:T00 – Create template framework - ✅ COMPLETE (v0.4.6.1+1)
  • E4:S06:T01 – Design Epic templates - ✅ COMPLETE (v0.4.6.2+1)
  • E4:S06:T02 – Create Story templates - ✅ COMPLETE (v0.4.6.3+1)
  • E4:S06:T03 – Build Task templates - ✅ COMPLETE (v0.4.6.4+1)
  • E4:S06:T04 – Create template validation - ✅ COMPLETE (v0.4.6.5+1)
  • E4:S06:T05 – Implement template system - ✅ COMPLETE (v0.4.6.6+1)
  • E4:S06:T06 – Create template documentation - ✅ COMPLETE (v0.4.6.7+1)
  • E4:S06:T07 – Add template examples - ✅ COMPLETE (v0.4.6.8+1)
  • E4:S06:T08 – Create template testing - ✅ COMPLETE (v0.4.6.8+1)
  • E4:S06:T09 – Implement template distribution - ✅ COMPLETE (v0.4.6.8+1)
  • E4:S06:T10 – Create template migration - ✅ COMPLETE (v0.4.6.8+1)

Story 007: Migration Support and Installation Modes ✅ COMPLETE (v0.4.7.3+1)

  • E4:S07:T00 – Design migration framework - ✅ COMPLETE (v0.4.7.1+1)
  • E4:S07:T01 – Create installation modes - ✅ COMPLETE (v0.4.7.2+1)
  • E4:S07:T02 – Implement migration scripts - ✅ COMPLETE (v0.4.7.3+1)
  • E4:S07:T03 – Create migration documentation - ✅ COMPLETE (v0.4.7.3+1)

Story 008: Intelligent Epic Matching and Canonical Structure Adoption ✅ COMPLETE (v0.4.8.6+1)

  • E4:S08:T01 – Create matching algorithm - ✅ COMPLETE (v0.4.8.1+1)
  • E4:S08:T02 – Implement structure validation - ✅ COMPLETE (v0.4.8.2+1)
  • E4:S08:T03 – Create canonical adoption - ✅ COMPLETE (v0.4.8.3+1)
  • E4:S08:T04 – Add intelligent matching - ✅ COMPLETE (v0.4.8.4+1)
  • E4:S08:T05 – Create matching documentation - ✅ COMPLETE (v0.4.8.5+1)
  • E4:S08:T06 – Implement validation system - ✅ COMPLETE (v0.4.8.6+1)

Story 009: Bug Fixes and Agentic Intelligence Implementation ✅ COMPLETE (v0.4.9.1+1)

  • E4:S09:T01 – Fix critical bugs - ✅ COMPLETE (v0.4.9.1+1)

Story 010: Agentic Kanban Task Creation from FR/BR ✅ COMPLETE (v0.4.10.7+0)

  • E4:S10:T00 – Create agentic framework - ✅ COMPLETE (v0.4.10.1+1)
  • E4:S10:T01 – Implement FR processing - ✅ COMPLETE (v0.4.10.2+1)
  • E4:S10:T02 – Add BR processing - ✅ COMPLETE (v0.4.10.3+1)
  • E4:S10:T03 – Create task generation - ✅ COMPLETE (v0.4.10.4+1)
  • E4:S10:T04 – Implement validation - ✅ COMPLETE (v0.4.10.5+1)
  • E4:S10:T05 – Add integration testing - ✅ COMPLETE (v0.4.10.6+1)
  • E4:S10:T06 – Create documentation - ✅ COMPLETE (v0.4.10.7+0)
  • E4:S10:T07 – Add deployment support - ✅ COMPLETE (v0.4.10.7+0)

Story 011: Kanban Granularity & Discrete Task Docs ✅ COMPLETE (v0.4.11.6+2)

  • E4:S11:T00 – Design granularity framework - ✅ COMPLETE (v0.4.11.1+1)
  • E4:S11:T01 – Create discrete task structure - ✅ COMPLETE (v0.4.11.2+2)
  • E4:S11:T02 – Implement task documentation - ✅ COMPLETE (v0.4.11.3+1)
  • E4:S11:T03 – Create task validation - ✅ COMPLETE (v0.4.11.4+1)
  • E4:S11:T04 – Add task tracking - ✅ COMPLETE (v0.4.11.5+0)
  • E4:S11:T05 – Implement task integration - ✅ COMPLETE (v0.4.11.6+2)
  • E4:S11:T06 – Create task documentation - ✅ COMPLETE (v0.4.11.6+2)

Story 013: Kanban Board Enhancement - MoSCOW Prioritized Task View ✅ COMPLETE (v0.4.13.6+2)

  • E4:S13:T01 – Create MoSCOW view - ✅ COMPLETE (v0.4.13.1+1)
  • E4:S13:T02 – Implement prioritization - ✅ COMPLETE (v0.4.13.2+1)
  • E4:S13:T03 – Add task ordering - ✅ COMPLETE (v0.4.13.3+1)
  • E4:S13:T04 – Create view validation - ✅ COMPLETE (v0.4.13.4+3)
  • E4:S13:T05 – Implement view updates - ✅ COMPLETE (v0.4.13.5+1)
  • E4:S13:T06 – Add view documentation - ✅ COMPLETE (v0.4.13.6+2, 2025-12-15T14:00:00Z)

Story 016: Kanban Package Implementation Review ✅ COMPLETE (v0.4.16.5+2)

  • E4:S16:T01 – Review implementation - ✅ COMPLETE (v0.4.16.1+1)
  • E4:S16:T02 – Create gap analysis - ✅ COMPLETE (v0.4.16.2+1)
  • E4:S16:T03 – Implement remediation - ✅ COMPLETE (v0.4.16.3+1)
  • E4:S16:T04 – Add validation testing - ✅ COMPLETE (v0.4.16.4+1)
  • E4:S16:T05 – Create risk assessment - ✅ COMPLETE (v0.4.16.5+2)

Story 017: Kanban Package Installation Evaluation ✅ COMPLETE (v0.4.17.6+1)

  • E4:S17:T01 – Evaluate installation - ✅ COMPLETE (v0.4.17.1+1)
  • E4:S17:T02 – Test installation process - ✅ COMPLETE (v0.4.17.2+1)
  • E4:S17:T03 – Validate installation - ✅ COMPLETE (v0.4.17.3+1)
  • E4:S17:T04 – Create installation guide - ✅ COMPLETE (v0.4.17.4+1)
  • E4:S17:T05 – Add troubleshooting - ✅ COMPLETE (v0.4.17.5+1)
  • E4:S17:T06 – Document evaluation - ✅ COMPLETE (v0.4.17.6+1)

Story 018: Kanban Board Info-Only Split ✅ COMPLETE (v0.4.18.1+1)

  • E4:S18:T01 – Implement three-way split - ✅ COMPLETE (v0.4.18.1+1)
  • E4:S18:T02 – Upgrade packaged framework - ✅ COMPLETE (v0.4.18.2+1)

Epic 6: Framework Management and Maintenance ✅ COMPLETE

Status: COMPLETE
Completed: 2026-01-05
Version: v0.6.8.13+1

Story 001: Framework Version Management

  • E6:S01:T01 – Create versioning strategy - COMPLETE (v0.6.1.1+1)
  • E6:S01:T02 – Implement version tracking - COMPLETE (v0.6.1.2+1)
  • E6:S01:T03 – Create compatibility policy - COMPLETE (v0.6.1.3+1)
  • E6:S01:T04 – Add dependency architecture - COMPLETE (v0.6.1.4+1)
  • E6:S01:T05 – Create version tagging - COMPLETE (v0.6.1.5+1)

Story 002: Framework Update and Migration

  • E6:S02:T01 – Create update procedures - COMPLETE (v0.6.2.1+1)
  • E6:S02:T02 – Build migration guide - COMPLETE (v0.6.2.2+1)
  • E6:S02:T03 – Implement backward compatibility - COMPLETE (v0.6.2.3+1)
  • E6:S02:T05 – Add auto-update mechanisms - COMPLETE (v0.6.2.5+1)

Story 003: Framework Health Monitoring ✅ COMPLETE

  • E6:S03:T01 – Define health metrics - ✅ COMPLETE (v0.6.3.1+1)
  • E6:S03:T02 – Create monitoring tools - ✅ COMPLETE (v0.6.3.2+1)
  • E6:S03:T03 – Build health dashboard - ✅ COMPLETE (v0.6.3.3+1)

Story 008: ai-dev-kit CLI Tool ✅ COMPLETE (v0.6.8.13+1)

  • E6:S08:T00 – Design CLI architecture - ✅ COMPLETE (v0.6.8.1+1)
  • E6:S08:T01 – Implement core commands - ✅ COMPLETE (v0.6.8.2+1)
  • E6:S08:T02 – Add backend abstraction - ✅ COMPLETE (v0.6.8.3+1)

Story 006: Feature Requests 🔄 IN PROGRESS

  • E6:S06:T01 – FR/BR/UXR Prioritization Board Implementation - ✅ COMPLETE (v0.6.6.1+1)
  • E6:S06:T02 – Fix Release Workflow Micromanagement Issues - ✅ COMPLETE (v0.6.6.2+8, 2026-03-11T16:45:00Z)
  • E6:S06:T03 – Investigate Apple SDK License Blocking Issue - ✅ COMPLETE (v0.6.6.3+1)
  • E6:S06:T41 – Windsurf: Investigate how to leverage AGENTS.md and SKILL.md for workflows - ✅ COMPLETE (v0.6.6.41+1, 2026-03-11T16:05:00Z)
  • E6:S06:T42 – Fix UKW Agent Board Cleanup Failure - ✅ COMPLETE (v0.6.6.41+1, 2026-03-11T16:15:00Z)
  • E6:S06:T999 – Board Cleanup Test Task - ✅ COMPLETE (v0.6.6.41+1, 2026-03-11T16:10:00Z)
  • E6:S08:T03 – Create configuration management - ✅ COMPLETE (v0.6.8.4+1)
  • E6:S08:T04 – Add error handling - ✅ COMPLETE (v0.6.8.5+1)
  • E6:S08:T05 – Create migration utilities - ✅ COMPLETE (v0.6.8.6+1)
  • E6:S08:T06 – Add remove command - ✅ COMPLETE (v0.6.8.7+1)
  • E6:S08:T07 – Create documentation - ✅ COMPLETE (v0.6.8.8+1)
  • E6:S08:T08 – Add testing framework - ✅ COMPLETE (v0.6.8.9+1)
  • E6:S08:T09 – Implement validation - ✅ COMPLETE (v0.6.8.10+1)
  • E6:S08:T10 – Add PyPI packaging - ✅ COMPLETE (v0.6.8.11+1)
  • E6:S08:T11 – Create deployment scripts - ✅ COMPLETE (v0.6.8.12+1)
  • E6:S08:T12 – Add integration testing - ✅ COMPLETE (v0.6.8.13+1)
  • E6:S08:T13 – Create user guide - ✅ COMPLETE (v0.6.8.13+1)

Epic 7: Codebase Maintenance and Review ✅ COMPLETE

Status: COMPLETE
Completed: 2026-01-05
Version: v0.7.5.4+1

Story 001: Codebase Maintenance Tasks ✅ COMPLETE

  • E7:S01:T02 – Create maintenance framework - ✅ COMPLETE (v0.7.1.2+1)
  • E7:S01:T03 – Document maintenance workflows - ✅ COMPLETE (v0.7.1.3+1)
  • E7:S01:T04 – Integrate with Kanban - ✅ COMPLETE (v0.7.1.4+1)
  • E7:S01:T05 – PERPETUAL: Markdown maintenance - 🔄 ONGOING
  • E7:S01:T06 – Implement Update Changelog Workflow (UCW) - ✅ COMPLETE (v0.7.1.7+4)
  • E7:S01:T07 – Markdown Maintenance Workflow (MMW) - ✅ COMPLETE (v0.7.1.7+4)
  • E7:S01:T08 – Task Doc Naming Standardization - ✅ COMPLETE (v0.7.1.8+4)
  • E7:S01:T09 – Kanban Template Governance & UXR Ownership - ✅ COMPLETE (v0.7.1.9+4)
  • E7:S01:T10 – Enhanced Workflow Logging System Implementation - ✅ COMPLETE (v0.7.1.10+1, 2026-03-17T12:00:00Z)

Story 002: Code Review Standards and Processes ✅ COMPLETE

  • E7:S02:T01 – Create review standards - ✅ COMPLETE (v0.7.2.1+1)
  • E7:S02:T02 – Build checklist templates - ✅ COMPLETE (v0.7.2.2+1)
  • E7:S02:T03 – Establish review workflows - ✅ COMPLETE (v0.7.2.3+1)
  • E7:S02:T04 – Integrate with Kanban - ✅ COMPLETE (v0.7.2.4+1)

Story 003: Code Quality Metrics and Monitoring ✅ COMPLETE

  • E7:S03:T01 – Design metrics framework - ✅ COMPLETE (v0.7.3.1+0)
  • E7:S03:T02 – Create monitoring dashboards - ✅ COMPLETE (v0.7.3.2+0)
  • E7:S03:T03 – Integrate with Kanban - ✅ COMPLETE (v0.7.3.3+0)
  • E7:S03:T04 – Document monitoring processes - ✅ COMPLETE (v0.7.3.4+0)

Story 004: Maintenance Automation and Tooling ✅ COMPLETE

  • E7:S04:T01 – Design automation requirements - ✅ COMPLETE (v0.7.4.1+0)
  • E7:S04:T02 – Develop automation scripts - ✅ COMPLETE (v0.7.4.2+0)
  • E7:S04:T03 – Integrate with workflows - ✅ COMPLETE (v0.7.4.3+0)
  • E7:S04:T04 – Document automation usage - ✅ COMPLETE (v0.7.4.4+0)

Story 005: Migration UXR – Pre-Existing Kanban Structures ✅ COMPLETE

  • E7:S05:T01 – Synthesize UXR-001 - ✅ COMPLETE (v0.7.5.1+0)
  • E7:S05:T02 – Synthesize UXR-002 - ✅ COMPLETE (v0.7.5.2+0)
  • E7:S05:T03 – Synthesize UXR-003 - ✅ COMPLETE (v0.7.5.3+0)
  • E7:S05:T04 – Synthesize UXR-004 - ✅ COMPLETE (v0.7.5.4+0)

Epic 5: Framework Management and FR Repository 🔄 IN PROGRESS

Status: IN PROGRESS
Started: 2025-12-04
Version: v0.5.1.48+1

Story 001: Feature Request Repository 🔄 IN PROGRESS (PERPETUAL)

  • E5:S01:T34 – UKW Granular Control and Use Case Flags - ✅ COMPLETE (v0.5.1.34+1)
  • E5:S01:T36 – RW Update Kanban Board on Task Completion - ✅ COMPLETE (v0.5.1.36+1)
  • E5:S01:T37 – Kanban Policy Task Prioritisation and Queue/Stack - ✅ COMPLETE (v0.5.1.37+3)
  • E5:S01:T49 – Enhanced kanban-completed.md with Timestamps and Recent Tasks - ✅ COMPLETE (v0.5.1.49+2, 2026-03-11T16:30:00Z)
  • E5:S01:T47 – Install Logging for Framework Dependencies - 🔄 IN PROGRESS (v0.5.1.47+3)

Epic 8: Tooling & Automation ✅ COMPLETE

Status: COMPLETE
Completed: 2026-03-12
Version: v0.8.4.1+1

Story 001: Code Generators ✅ COMPLETE

  • E8:S01:T01 – Create generator framework - ✅ COMPLETE (v0.8.1.1+1)
  • E8:S01:T02 – Build template-based generators - ✅ COMPLETE (v0.8.1.2+1)
  • E8:S01:T03 – Establish generator patterns - ✅ COMPLETE (v0.8.1.3+1)

Story 002: Additional Validators ✅ COMPLETE

  • E8:S02:T01 – Create validator framework - ✅ COMPLETE (v0.8.2.1+1)
  • E8:S02:T02 – Build framework-specific validators - ✅ COMPLETE (v0.8.2.2+1)
  • E8:S02:T03 – Establish validation patterns - ✅ COMPLETE (v0.8.2.3+1)

Story 004: Tooling Baseline ✅ COMPLETE

  • E8:S04:T01 – Tooling & Automation expectations baseline - ✅ COMPLETE (v0.8.4.1+1)

Epic 10: Documentation and Knowledge Management ✅ COMPLETE

Status: COMPLETE
Completed: 2026-03-12
Version: v0.10.1.1+1

Story 001: Documentation Lifecycle ✅ COMPLETE

  • E10:S01:T01 – Doc lifecycle expectations baseline - ✅ COMPLETE (v0.10.1.1+1)

Epic 11: Debugging and Troubleshooting ✅ COMPLETE

Status: COMPLETE
Completed: 2026-03-12
Version: v0.11.1.1+1

Story 001: Debug Path ✅ COMPLETE

  • E11:S01:T01 – Debug path expectations baseline - ✅ COMPLETE (v0.11.1.1+1)

Forensic Markers

Format: ✅ COMPLETE (vRC.EPIC.STORY.TASK+BUILD)

Examples:

  • ✅ COMPLETE (v0.4.18.1+1) - Epic 4, Story 18, Task 1, Build 1
  • ✅ COMPLETE (v0.7.1.5+2) - Epic 7, Story 1, Task 5, Build 2

Purpose:

  • Track exact version when task completed
  • Enable forensic analysis of project history
  • Support rollback and impact analysis
  • Provide audit trail for releases

Completion Statistics

Overall Progress

  • Total Epics: 9 (6 COMPLETE, 3 IN PROGRESS/TODO)
  • Total Stories: 50+ (35+ COMPLETE, others IN PROGRESS/TODO)
  • Total Tasks: 200+ (160+ COMPLETE, others IN PROGRESS/TODO)

Completion Rate by Epic

  • Epic 1: 100% (3/3 Stories COMPLETE)
  • Epic 3: 100% (3/3 Stories COMPLETE)
  • Epic 6: 100% (8/8 Stories COMPLETE)
  • Epic 7: 100% (5/5 Stories COMPLETE)
  • Epic 8: 100% (3/3 Stories COMPLETE)
  • Epic 10: 100% (1/1 Stories COMPLETE)
  • Epic 11: 100% (1/1 Stories COMPLETE)
  • Epic 4: 85% (15/18+ Stories COMPLETE)
  • Epic 2: 75% (8/11 Stories COMPLETE)
  • Epic 5: 40% (2/5 Stories COMPLETE)
  • Epic 9: 20% (1/5 Stories COMPLETE)

Notes

  • This document complements the three-way Kanban split
  • Use kboard.md for active MoSCOW tasks
  • Use kanban-structure.md for Epic/Story/Task hierarchy
  • Use kanban-board-guide.md for rules and procedures
  • This document serves as the historical record of all completed work

Last Updated: 2026-03-12 (UKW: Post-RW Board Synchronization - All 8 Should Have Tasks Completed)