Skip to main content

AI Dev Kit – FR/BR/UXR Completed Items

Last Updated: 2026-04-19 (RW E5:S09:T11+5: BR-068 COMPLETE) Version: v0.5.9.11+5

For open FR/BR/UXR items, see: fbuboard.md
For MoSCOW prioritized tasks, see: kboard.md
For completed Kanban tasks (E/S/T), see: kanban-completed.md
For Epic/Story/Task structure, see: kanban-structure.md
For rules and explanations, see: kanban-board-guide.md


Overview

This document tracks all completed FRs (Feature Requests), BRs (Bug Reports), and UXRs (User Experience Research) across the AI Dev Kit project. Items are organized by type with completion dates, version markers, and references to implementing tasks for forensic tracking.

Completion Criteria: An FR/BR/UXR is marked COMPLETE only when:

  • Implementation is fully done (code or docs delivered, released in a version)
  • Sign-off is obtained (validated, accepted by the responsible party)
  • Associated tasks are completed (if converted to Kanban tasks)

20 Most Recently Completed FR/BR/UXR Items

IDTypeDescriptionCompletedVersionAgent
BR-068BRDocusaurus strict MDX cannot resolve monorepo markdown links — portal strict build restored (Strategy A) (E5:S09:T11)2026-04-19v0.5.9.11+5RW Agent
FR-080FREnd-to-end greenfield installation process — INSTALL + orchestrator + user-docs + validators / evidence (E6:S09:T01)2026-04-19v0.6.9.1+8RW Agent
UXR-007UXRInteractive installer Kanban pattern prompt clarity — installer UX + ICW publication alignment (E7:S06:T18)2026-04-18v0.7.6.18+3UKW Agent
BR-063BRRW -k task attribution drift vs version.py anchor — forensic-strict guard, --art, version validation, tests, docs2026-04-07v0.2.1.13+2RW Agent
FR-075FRICW durable planning artifacts — repo SoT under docs/implementation-cycles/, policy, ICW docs, .cursorrules2026-04-01v0.5.1.75+1RW Agent
FR-064FRRetire shields branch — static README badges; removed update-badges.yml BYOB; deleted origin/shields2026-03-30v0.5.1.69+1RW Agent
BR-056BRRW ambiguous task identifier typo risk2026-03-25T12:55:31Zv0.6.6.56+4RW Agent
BR-055BRMissing Implementation Cycle Workflow (ICW)2026-03-12T15:35:00Zv0.4.14.3+2ICW Agent
BR-054BRKanban Package Migration/Installation Completely Broken2026-03-12T13:20:00Zv0.24.2.1+1Documentation Agent
BR-009BRInstaller Discoverability and Documentation2026-03-09T16:00:00Zv0.6.7.104+2RW Agent
FR-051FRFR/BR/UXR Prioritization Board2026-03-09T15:20:00Zv0.6.7.107+1Documentation Agent

2026-04-19

BR-068 – Docusaurus strict MDX cannot resolve monorepo markdown links — production build fails
Completed: 2026-04-19 (v0.5.9.11+5)
Implementing Task: E5:S09:T11
Completing Agent: RW Agent
Resolution: IPW-E5S09T11 Waves 1–4 — Strategy A corpus normalization; npm run build strict green; BR-068 §Acceptance Criteria satisfied (CI gate: docusaurus-build.yml). Row removed from fbuboard.md.


FR-080 – End-to-end greenfield installation process
Completed: 2026-04-19 (v0.6.9.1+8)
Implementing Task: E6:S09:T01
Completing Agent: RW Agent
Resolution: Functional + non-functional requirements satisfied per Implementation evidence on FR-080; deferrals explicit (FR-078/079 product telemetry, FR-082/T03 canonical coordinates). Row removed from fbuboard.md.


2026-04-18

UXR-007 – Interactive Installer Kanban Pattern Prompt Clarity
Completed: 2026-04-18 (v0.7.6.18+3)
Implementing Task: E7:S06:T18
Completing Agent: UKW Agent
Resolution: Implementing task COMPLETE; intake doc UXR-007 set to Status: COMPLETE; Must Have row removed from fbuboard.md per active-board hygiene.


Completed Bug Reports

2026-03-25

BR-056 – RW Accepts Ambiguous Task Identifier Without Validation (Typo Risk)
Completed: 2026-03-25T12:55:31Z (v0.6.6.56+4)
Implementing Task: E6:S06:T56
Completing Agent: RW Agent
Resolution: validate_rw_task_intent.py + RW Step 1b guard; live verification confirmed story-mismatch and epic-mismatch abort before Step 2 edits.

2026-03-12

BR-055 – Missing Implementation Cycle Workflow (ICW)
Completed: 2026-03-12T15:35:00Z (v0.4.14.3+2)
GitHub Issue: #22
Implementing Task: E4:S14:T03
Completing Agent: ICW Agent
Resolution: Complete ICW implementation with workflow generator integration, comprehensive documentation, and testing suite. ICW now available as standard workflow type following agent-driven execution pattern. Framework completeness restored with all standard workflow types available.

BR-054 – Kanban Package Migration/Installation Completely Broken
Completed: 2026-03-12T13:20:00Z (v0.24.2.1+1)
GitHub Issue: #17
Implementing Story: E4:S17
Completing Agent: Documentation Agent
Description: Comprehensive evaluation and resolution of kanban package installation issues including migration path failures, path inflexibility, missing validation, and poor error handling
Impact: Package upgraded from beta to production-ready with comprehensive testing and validation
Files Created:

  • BR-054 - Bug report documentation

2026-03-09

BR-009 – Installer Discoverability and Documentation
Completed: 2026-03-09T16:00:00Z (v0.6.7.104+2)
GitHub Issue: #14
Implementing Task: E4:S06:T07
Completing Agent: RW Agent
Description: Fixed installer prominence and template distinction issues in kanban framework installation
Impact: Users now properly guided to use interactive installer with clear template vs. actual kanban distinction
Files Referenced:

  • BR-009 - Bug report documentation

Completed Feature Requests

2026-03-09

FR-051 – FR/BR/UXR Prioritization Board
Completed: 2026-03-09T15:20:00Z (v0.6.7.107+1)
Implementing Task: E6:S06:T01
Completing Agent: Documentation Agent
Description: Created prioritization board for FRs, BRs, and UXRs with identical structure to Kanban board
Impact: Provides systematic FR/BR/UXR management with centralized visibility and prioritization
Files Created:

  • fbuboard.md - Main prioritization board
  • fr-br-uxr-completed.md - Completed items tracking
  • Updated Kanban board and documentation integration

Completed Bug Reports

No bug reports completed yet


Completed User Experience Research

No UXR items completed yet


Implementation Statistics

By Type:

  • Feature Requests: 1 completed
  • Bug Reports: 0 completed
  • User Experience Research: 0 completed
  • Total: 1 completed

By Year:

  • 2026: 1 completed

By Implementing Epic:

  • Epic 6 (Framework Management): 1 completed

Completion Process

When an FR/BR/UXR is Completed:

  1. Implementation Complete - All code/docs delivered and released
  2. Validation Done - Implementation tested and accepted
  3. Task Completion - Associated Kanban tasks marked complete
  4. Board Update - Move from fbuboard.md to this completed board
  5. Documentation - Record completion details and impact

For FRs Converted to Tasks:

  • Track both FR completion and implementing task completion
  • Reference the specific task(s) that implemented the FR
  • Note the version where the implementation was released

For BRs:

  • Record the fix implementation and testing results
  • Note the version where the bug was resolved
  • Reference any associated tasks that addressed the bug

For UXRs:

  • Document research findings and recommendations
  • Note any implementation changes based on research
  • Reference follow-up tasks or actions taken

Historical Reference

Completed Items by Implementation:

  • FR-051E6:S06:T01v0.6.7.107+1 - FR/BR/UXR Prioritization Board

Completion Patterns:

  • FR → Task Flow: Feature Requests typically convert to Kanban tasks before implementation
  • Direct Implementation: Some FRs/BRs may be implemented directly without task conversion
  • Research Integration: UXR items often inform multiple subsequent FRs and tasks

Integration with Kanban System

Cross-Reference System:

  • FR/BR/UXR DocumentsKanban TasksImplementationCompletion
  • Each completed item references its implementing task(s)
  • Kanban tasks reference their originating FR/BR/UXR documents

Workflow Integration:

  • Intake Workflow creates FR/BR/UXR documents
  • Task Creation converts FR/BR/UXRs to Kanban tasks (when appropriate)
  • Implementation completes the task and delivers the feature/fix
  • Completion Tracking records the final completion in this document

Usage Guidelines

For Adding Completed Items:

  1. Verify Completion - Ensure implementation is fully complete and released
  2. Gather Details - Collect completion date, version, and implementing task info
  3. Document Impact - Describe what was implemented and its impact
  4. Update Board - Remove from fbuboard.md and add to this completed board
  5. Cross-Reference - Ensure bidirectional references between FR/BR/UXR and tasks

For Reference:

  1. Look Up Completed Items - Use this document to find completed FR/BR/UXRs
  2. Track Implementation History - See which tasks implemented which FR/BR/UXRs
  3. Analyze Patterns - Review completion patterns for process improvement
  4. Avoid Duplication - Check completed items before creating similar FR/BR/UXRs

This document provides historical tracking and reference for all completed FR/BR/UXR items, ensuring complete lifecycle visibility from intake through completion.