T04 – Review Integrations and Dependency Alignment
Task ID: E4:S16:T04
Status: COMPLETE
Priority: HIGH
Estimated Effort: Medium
Created: 2026-01-19
Last updated: 2026-01-19 (v0.4.16.4+1 – Integration review complete: Kanban ↔ Versioning ↔ RW/UKW alignment validated)
Version: v0.4.16.4+1
Code: E4S16T04
Scope
Review and validate the integration points and dependency alignment between the Kanban framework package, the Numbering & Versioning package, and the Workflow Management package (Release Workflow + UKW). Confirm that documented integration behavior matches the dev-kit implementation and that there are no hidden coupling or dependency issues that would block RC sign-off.
Input
-
Kanban ↔ Versioning Integration Guide:
packages/frameworks/kanban/integration/numbering-versioning-integration.md -
Kanban ↔ Workflow Management Integration Guide:
packages/frameworks/kanban/integration/workflow-management-integration.md -
Governance Policy:
packages/frameworks/kanban/policies/kanban-governance-policy.md -
Release Workflow Definition & Docs:
packages/frameworks/workflow mgt/workflows/release-workflow.yamlpackages/frameworks/workflow mgt/KB/Documentation/Developer_Docs/vwmp/release-workflow-reference.md.cursorrules(RW section – dual tagging, SemVer integration, GitHub release)
-
Update Kanban Workflow (UKW):
packages/frameworks/workflow mgt/workflows/update-kanban-workflow.yaml
-
Dev-Kit Kanban Implementation:
docs/project-management/kanban/kboard.mddocs/project-management/kanban/epics/Epic-4/Epic-4.mddocs/project-management/kanban/epics/Epic-4/Story-016-kanban-package-implementation-review.md
Deliverable
An integration alignment report confirming:
- How Kanban integrates with Numbering & Versioning (forensic markers, Story/Epic headers).
- How Kanban integrates with Workflow Management (RW, validators, automatic Kanban updates).
- How UKW uses Kanban structures and perpetual tasks.
- Whether dev-kit’s actual implementation matches the integration guides.
- Any gaps, risks, or misalignments that could impact RC sign-off.
Acceptance Criteria
- Integration points between Kanban and Numbering & Versioning reviewed and documented. ✅ COMPLETE
- Integration points between Kanban and Workflow Management (RW + UKW) reviewed and documented. ✅ COMPLETE
- Dependency assumptions (hard vs soft dependencies) validated against implementation. ✅ COMPLETE
- Any integration misalignments or risks identified and categorized by severity. ✅ COMPLETE (no blocking issues found)
Integration Alignment Findings
1. Kanban ↔ Numbering & Versioning
Documentation Source: integration/numbering-versioning-integration.md
Key Expectations:
- Version schema:
RC.EPIC.STORY.TASK+BUILD(RC=0 for development). - Story/Epic documents carry forensic markers in checklists and headers.
- Tasks use
E\{epic\}:S\{story\}:T\{task\}naming and record versions in completion lines. - Epic headers record
Last updatedwith version and short summary.
Dev-Kit Implementation:
- Kanban board and Epic/Story docs use
vRC.E.S.T+Bconsistently (e.g.,v0.4.16.2+1). - Story 016 checklist uses version markers as SoT (for T01/T02/T03).
- Epic 4 document tracks story status with version markers.
Conclusion: ✅ Integration aligned
- Version schema and forensic marker usage match the integration guide.
- No conflicting patterns or legacy date-only markers for the Kanban framework.
2. Kanban ↔ Workflow Management (Release Workflow)
Documentation Sources:
integration/workflow-management-integration.mdworkflows/release-workflow.yaml- RW reference docs +
.cursorrules
Key Expectations:
-
RW is the canonical mechanism for updating Kanban docs with versions.
-
Step 4 / Step 7 (depending on version) perform auto-update of Kanban docs:
- Epic headers (
Last updated+ version summary). - Story Checklists and detailed sections (forensic markers, status).
- Epic headers (
-
RW uses ANALYZE → DETERMINE → EXECUTE → VALIDATE → PROCEED pattern.
-
RW integrates with Kanban governance (KG-IP1/KG-IP2) and validation scripts.
Dev-Kit Implementation:
release-workflow.yamlincludes a kanban_update step wired toupdate_kanban_docs.py..cursorrulesRW section requires Kanban updates and traces version ↔ task alignment.- Recent RWs for Kanban work (E4:S16, E4:S17, E4:S14) updated:
- Kanban board (MoSCOW sections, Epics summary, Story Checklist).
- Epic 4 and Story 016 metadata (
Last updated,Version, task status).
Conclusion: ✅ Integration aligned
- The installed RW configuration matches the integration guide’s expectations.
- Kanban updates are driven through RW, not ad-hoc/manual scripts.
3. Kanban ↔ UKW (Update Kanban Workflow)
Documentation Source: update-kanban-workflow.yaml + Kanban governance policy.
Key Expectations:
- UKW performs bottom-up Kanban synchronization (Tasks → Stories → Epics → Board).
- Uses Kanban’s perpetual task for UKW (E6:S07:T101, with
perpetual_task: true). - Uses Kanban document structure (
kanban_root,epic_doc_pattern,story_doc_pattern,task_doc_pattern).
Dev-Kit Implementation:
- UKW config points to dev-kit Kanban paths under
docs/project-management/kanban. - Perpetual UKW task wired as E6:S07:T101 (confirmed in Epic 6 + Kanban board).
- UKW runs have updated:
- Task/Story/Epic statuses and
Last updatedfields. - MoSCOW board entries (with BR-034 tracking a prior prioritization gap).
- Task/Story/Epic statuses and
Conclusion: ✅ Integration aligned (with known UKW MoSCOW bug tracked via BR-034)
- Structural and path-level alignment is correct.
- Behavior-level gap (MoSCOW prioritization) is already captured in BR-034 and not a Kanban-package integration flaw.
4. Dependency Assumptions (Hard vs Soft)
From Kanban README and Governance Policy:
- Hard dependencies: Git + Markdown.
- Soft dependencies: Numbering & Versioning, Workflow Management.
- Kanban can run standalone, but fully-featured integration uses both packages.
Dev-Kit Implementation:
- Kanban package is installed alongside both frameworks in
packages/frameworks/. - Documentation and policies clearly describe optional vs required dependencies.
- No circular dependency detected between Kanban, Versioning, and Workflow Management.
Conclusion: ✅ Dependency alignment correct
- Dependency graph is consistent with documentation.
- Projects can, in principle, consume Kanban without installing the other packages.
Risks & Gaps
- Risk Level: LOW
- Findings:
- No structural or configuration misalignments found between Kanban and its dependencies.
- Known behavior bug (UKW MoSCOW prioritization, BR-034) is tracked as workflow behavior, not an integration-wiring defect within the Kanban package itself.
RC Impact:
- No integration issues that would block RC sign-off for the Kanban package.
Summary
Overall Integration Status: ✅ COMPLIANT / RC-READY
- Kanban ↔ Numbering & Versioning: Aligned.
- Kanban ↔ Workflow Management (RW): Aligned.
- Kanban ↔ UKW: Aligned structurally; behavior bug tracked separately.
- Dependency model (hard vs soft): Aligned.
No additional remediation tasks are required from an integration and dependency alignment perspective. Any remaining work is captured in other stories/tasks (e.g., BR-034 for UKW behavior).
Notes
- This task focuses on framework-level integration alignment, not individual bug behavior inside workflows.
- BR-034 and BR-035 demonstrate that integration wiring is in place and that Kanban + Workflow Management are being exercised in real workflows; the remaining issues are workflow behavior refinements rather than structural misalignment.