Skip to main content

RW-AGENT-001 Setup: Release Workflow for Completed Tasks

Execution Date: 2026-03-12
Release Manager Agent: RW-AGENT-001
Mission: Execute Release Workflow for 5 Completed "Could Have" Tasks
Target Tasks: 5 completed task groups
Release Mode: Task-Touch SemVer


Mission Briefing

RW-AGENT-001 will coordinate multiple sub-agents to execute the 17-step Release Workflow for the 5 recently completed "Could Have" tasks, ensuring proper version management, documentation updates, and release quality standards.


Task Inventory

Target Tasks for Release (5 Groups)

  1. E5:S01:T31 – Multi-Agent Coordination Feasibility Investigation (COMPLETE)
  2. E5:S03:T01-T03 – Documentation Automation (ARCHIVED)
  3. E8:S03:T01-T03 – Automation Scripts (ARCHIVED)
  4. E24:S01:T01-T04 – Book Content Development (COMPLETED AND ARCHIVED)
  5. E24:S02:T01-T03 – Book Integration with Dev-Kit (ARCHIVED)

Release Configuration

  • SemVer Strategy: task_touch
  • Expected Tag Format: v{MAJOR.MINOR.PATCH+BUILD}
  • Release Type: Consolidated release for all 5 tasks
  • Configuration File: rw-config.yaml

Sub-Agent Deployment

Sub-Agent Roster

  1. RW-VALIDATE-001: Release validation and pre-checks
  2. RW-VERSION-001: Version management and bumping
  3. RW-CHANGELOG-001: Changelog generation and updates
  4. RW-COMMIT-001: Git operations and tagging

Agent Assignment Strategy

  • RW-VALIDATE-001: Pre-release validation and quality assurance
  • RW-VERSION-001: Version bumping and management
  • RW-CHANGELOG-001: All documentation updates
  • RW-COMMIT-001: Git operations and tag creation

Release Strategy

Consolidated Release Approach

Rationale: Efficient release process for multiple related tasks

  • Single version bump for all 5 tasks
  • Consolidated changelog entry
  • Unified documentation updates
  • Single git tag and commit

Version Management

Current Version Assessment:

  • Check current project version
  • Determine appropriate version bump
  • Calculate new version number
  • Update version files accordingly

17-Step Release Workflow Plan

Phase 1: Pre-Release Validation (Steps 1-4)

  1. Branch Safety Check - Validate branch context
  2. Bump Version - Update version numbers
  3. Create Detailed Changelog - Generate comprehensive changelog
  4. Update Main Changelog - Update primary changelog

Phase 2: Documentation Updates (Steps 5-7)

  1. Update README - Update README with version references
  2. Update BR/FR Docs - Update feature request/bug report docs
  3. Auto-update Kanban Docs - Update kanban documentation

Phase 3: Preparation and Validation (Steps 8-10)

  1. Stage Files - Stage all changes for commit
  2. IDE Problem Check - Check for IDE issues
  3. Run Validators - Run all validation scripts

Phase 4: Git Operations (Steps 11-13)

  1. Commit Changes - Commit all release changes
  2. Create Git Tag - Create release tag
  3. Push to Remote - Push changes and tags

Phase 5: Post-Release (Steps 14-17)

  1. Post-Commit Verification - Verify release success
  2. Act on Results - Handle release results
  3. Check for PIR Trigger - Check post-release actions
  4. Housekeeping - Clean up and finalize

Quality Assurance Framework

Pre-Release Quality Gates

Branch Safety Validation:

  • Correct branch verification
  • Clean working directory
  • Proper git configuration
  • Network connectivity validation

Configuration Validation:

  • rw-config.yaml verification
  • SemVer strategy confirmation
  • Version file accessibility
  • Changelog configuration validation

Release Quality Assurance

Multi-Agent Coordination Quality:

  • Agent communication validation
  • Task completion verification
  • Quality standards compliance
  • Documentation completeness

Risk Management

Technical Risks

  1. Branch Safety Issues: Incorrect branch or uncommitted changes
  2. Configuration Problems: Missing or incorrect rw-config.yaml
  3. Version Conflicts: Version numbering conflicts or errors
  4. Git Operation Failures: Push failures or tag creation issues

Mitigation Strategies

  • Branch Safety: Comprehensive validation before release
  • Configuration: Pre-release configuration verification
  • Version Management: Automated version management with validation
  • Git Operations: Rollback procedures and error handling

Expected Deliverables

Primary Deliverables

  1. Release Tag: v{current_version}+1 (consolidated release)
  2. Changelog: Comprehensive changelog with all 5 task completions
  3. Updated Documentation: README, BR/FR docs, kanban docs
  4. Git Commit: Single commit with all release changes

Secondary Deliverables

  1. Release Report: Multi-agent execution summary
  2. Quality Report: Validation and quality assurance results
  3. Process Documentation: Release process improvements
  4. Communication: Release notification and summary

Success Criteria

Primary Success Metrics

  • Release Completion: All 17 RW steps completed successfully
  • Tag Creation: Proper release tag created and pushed
  • Documentation: All documentation updated accurately
  • Quality Standards: All quality gates passed

Secondary Success Metrics

  • Multi-Agent Coordination: Smooth agent collaboration
  • Process Efficiency: Release completed within timeline
  • Risk Management: No critical issues or rollbacks
  • Communication: Clear release communication

Setup Status: COMPLETE
Next Action: Deploy RW-VALIDATE-001 for pre-release validation
RW-AGENT-001 Status: READY FOR EXECUTION