ICW Specification: Task Template Cross-Wiring Section
Task ID: E5:S01:T35
ICW Cycle: ICW-COULD-HAVE-20260312
Status: SPECIFICATION COMPLETE
Priority: MEDIUM
Created: 2026-03-12
Project Manager Agent: PM-AGENT-002
Executive Summary
This specification defines the implementation of a cross-wiring section for task templates that enables comprehensive task relationship management and dependency tracking. The implementation will create a standardized framework for linking related tasks across different epics and stories.
Technical Architecture
System Overview
The Task Template Cross-Wiring Section will provide:
- Relationship Mapping: Links between related tasks across epics/stories
- Dependency Tracking: Clear dependency chains and prerequisites
- Template Integration: Seamless integration with existing task templates
- Visualization: Visual representation of task relationships
Component Architecture
graph TB
A[Cross-Wiring Engine] --> B[Relationship Mapper]
A --> C[Dependency Tracker]
A --> D[Template Integrator]
A --> E[Visualization Generator]
F[Task Templates] --> A
G[Kanban Framework] --> A
H[Documentation System] --> A
Implementation Details
Phase 1: Core Framework Development
Component 1: Cross-Wiring Engine
- Purpose: Central orchestration of task relationship management
- Responsibilities:
- Parse and validate cross-wiring configurations
- Maintain relationship integrity across updates
- Coordinate with template system
- Implementation: Python module with YAML configuration support
Component 2: Relationship Mapper
- Purpose: Map and maintain task relationships
- Features:
- Bi-directional relationship linking
- Relationship type classification (depends-on, relates-to, blocks)
- Automatic relationship validation
- Data Structure: Graph-based relationship model
Component 3: Dependency Tracker
- Purpose: Track and validate task dependencies
- Features:
- Circular dependency detection
- Dependency chain analysis
- Impact assessment for task changes
- Implementation: Dependency graph with validation algorithms
Phase 2: Template Integration
Component 4: Template Integrator
- Purpose: Integrate cross-wiring with existing task templates
- Features:
- Template syntax for cross-wiring declarations
- Automatic relationship extraction from templates
- Template validation with cross-wiring checks
- Template Syntax:
cross_wiring:
depends_on:
- E4:S11:T07 # Migrate Embedded Tasks
- E6:S07:T18 # Tool-Agnostic Workflow Tracking
relates_to:
- E5:S01:T31 # Multi-Agent Coordination
blocks:
- E5:S03:T01 # Documentation Automation
Component 5: Visualization Generator
- Purpose: Generate visual representations of task relationships
- Features:
- Relationship graph generation
- Interactive dependency maps
- Export to multiple formats (SVG, PNG, HTML)
- Implementation: Graphviz integration with custom styling
Phase 3: Documentation and Integration
Component 6: Documentation Integration
- Purpose: Integrate cross-wiring information into documentation
- Features:
- Automatic cross-reference generation
- Relationship summaries in task documents
- Kanban board integration
- Output Examples:
- "Related Tasks" sections in task documents
- Dependency indicators in kanban board
- Relationship impact reports
Data Model
Cross-Wiring Configuration
task_cross_wiring:
task_id: "E5:S01:T35"
relationships:
depends_on:
- task_id: "E4:S11:T07"
type: "hard_dependency"
description: "Requires embedded task migration framework"
- task_id: "E6:S07:T18"
type: "soft_dependency"
description: "Benefits from workflow tracking system"
relates_to:
- task_id: "E5:S01:T31"
type: "coordination"
description: "Multi-agent coordination investigation"
blocks:
- task_id: "E5:S03:T01"
type: "implementation_block"
description: "Documentation automation requires template cross-wiring"
metadata:
created_at: "2026-03-12T11:50:00Z"
last_updated: "2026-03-12T11:50:00Z"
version: "1.0.0"
Relationship Types
- Hard Dependency: Required for implementation
- Soft Dependency: Beneficial but not required
- Coordination: Related work that should be coordinated
- Implementation Block: Prevents implementation until resolved
Quality Assurance
Validation Criteria
- ✅ Relationship Integrity: All relationships reference valid tasks
- ✅ Circular Dependency Detection: No circular dependencies allowed
- ✅ Template Syntax: Valid YAML template syntax
- ✅ Documentation Integration: Cross-wiring visible in documentation
- ✅ Kanban Integration: Relationships reflected in kanban board
Test Scenarios
- Basic Relationship Mapping: Simple task-to-task relationships
- Complex Dependency Chains: Multi-level dependency tracking
- Circular Dependency Detection: Invalid relationship detection
- Template Integration: Cross-wiring in task templates
- Documentation Generation: Automatic cross-reference creation
- Kanban Board Integration: Visual relationship indicators
Integration Points
Kanban Framework Integration
- Board Updates: Automatic relationship indicators
- Task Cards: Related task links and dependency status
- Status Tracking: Dependency-aware status updates
Documentation System Integration
- Task Documents: Automatic "Related Tasks" sections
- Cross-References: Bidirectional linking between related tasks
- Impact Reports: Change impact analysis documentation
Template System Integration
- Task Templates: Cross-wiring syntax support
- Validation: Template validation with relationship checks
- Generation: Automatic relationship extraction
Success Metrics
Primary Objectives
- ✅ Cross-Wiring Framework: Complete implementation of all components
- ✅ Template Integration: Seamless integration with existing templates
- ✅ Documentation Integration: Automatic cross-reference generation
- ✅ Kanban Integration: Visual relationship indicators
Secondary Objectives
- ✅ Performance: Relationship queries under 100ms
- ✅ Usability: Intuitive template syntax
- ✅ Maintainability: Modular component architecture
- ✅ Extensibility: Support for custom relationship types
Risk Assessment
Technical Risks
- Complexity: Relationship management complexity
- Performance: Large relationship graph performance
- Integration: Integration with existing systems
Mitigation Strategies
- Complexity: Phased implementation with clear documentation
- Performance: Graph optimization and caching strategies
- Integration: Comprehensive testing and backward compatibility
Timeline and Milestones
Week 1: Core Framework
- Cross-Wiring Engine implementation
- Relationship Mapper development
- Basic dependency tracking
Week 2: Template Integration
- Template Integrator development
- Template syntax implementation
- Basic visualization
Week 3: Documentation and Integration
- Documentation integration
- Kanban board integration
- Comprehensive testing and validation
Specification Status: COMPLETE
Next Phase: Test Design
PM-AGENT-002 Approval: REQUIRED
ICW Cycle Progress: 1/3 COMPLETE