ICW-E2S01T14-Implementation-Plan: FR-048 Traceability Wiring
Task: E2:S01:T14
Related FR: FR-048
Host Task: T14-rw-trigger-extensions-multiple-use-cases-fr048.md
Created: 2026-04-09
Build Plan
- Normalize FR metadata (
Code,Implementing Task). - Ensure task doc has stable cross-links and release markers.
- Ensure Story checklist row includes task + FR links.
- Run release packaging to lock version anchor and changelog evidence.
- Validate all traceability invariants before closure.
Dependency Notes
- Requires canonical Story host path under Epic 2 Story 001.
- Depends on FR-048 and task doc availability.
- Uses RW release output as evidence anchor.
Rollback / Recovery Notes
- If checklist or FR linkage drifts, restore bidirectional links first, then rerun validation.
- If release metadata is missing, re-open task status to
IN PROGRESS, patch metadata, and re-run release workflow.
T15 Follow-up Delta Plan
A subsequent IPW E2S01T15 should:
- Clone this package structure using
ICW-E2S01T15-*filenames. - Replace FR/task identifiers:
FR-048->FR-049E2:S01:T14->E2:S01:T15
- Reuse identical validation matrix and failure-mode catalog.
- Capture new release markers (
Version,Version Anchor) for T15 only.
Validation Checklist (Exit Criteria)
- Artifact wiring: host task references all three IPW docs.
- FR/task/story links are bidirectional and resolve.
- Task has release metadata fields populated.
- Follow-up T15 delta is explicit and actionable without rediscovery.
- Handoff section contains exact file list for next IPW run.
Handoff for IPW E2S01T15
Use this checklist in the next run:
- Create:
docs/implementation-cycles/ICW-E2S01T15-specification.mddocs/implementation-cycles/ICW-E2S01T15-test-design.mddocs/implementation-cycles/ICW-E2S01T15-implementation-plan.md
- Repoint host task links in
T15task doc. - Apply ID/path substitutions listed in the delta plan.
- Re-run traceability checks against
FR-049,T15, and Story 001 checklist row.