Skip to main content

IPW Publication Backfill Inventory (BR-066)

Method

  • Scanned docs/implementation-cycles/ for task-addressed planning artifacts matching ICW-E*S*T* or IPW-E*S*T*.
  • Scanned task docs under docs/project-management/kanban/epics/**/T*.md for explicit links to those artifact basenames.
  • Marked artifacts as missing wiring when basename was not referenced by any task doc.

Initial Results

  • Task-addressed artifacts scanned: 45
  • Missing task-doc wiring references: 16

Missing wiring sample (first 25)

  • ICW-E10S01T01-specification.md
  • ICW-E11S01T01-specification.md
  • ICW-E1S06T01-specification.md
  • ICW-E4S11T07-specification.md
  • ICW-E5S01T35-implementation-plan.md
  • ICW-E5S01T35-package-summary.md
  • ICW-E5S01T35-specification.md
  • ICW-E5S01T35-test-design.md
  • ICW-E5S01T46-specification.md
  • ICW-E5S01T46-test-design.md
  • ICW-E6S07T106-specification.md
  • ICW-E6S07T18-specification.md
  • ICW-E7S01T07-implementation-plan.md
  • ICW-E7S01T07-specification.md
  • ICW-E7S01T07-test-design.md
  • ICW-E8S04T01-specification.md

Phased Backfill Plan

  1. Phase 1 (quick wins): Wire high-confidence known gaps used in active governance work (starting with E2:S01:T17 and adjacent FR-077 lineage).
  2. Phase 2 (bulk): Run validator-driven sweep per story, add task-level links for each artifact package.
  3. Phase 3 (enforcement): Gate release closure for applicable tasks on validate_ipw_publication_wiring.py --requested E:S:T pass (or explicit NOT_APPLICABLE with reason).
  4. Phase 4 (maintenance): Add periodic audit in UKW/RW ops cadence to prevent drift recurrence.