E7:S06:T18 — IPW index (canonical split)
Status: Superseded by split ICW package — content is canonical in the three files below (BR-066 publication contract).
Host Task: T18-interactive-installer-kanban-pattern-prompt-clarity.md (E7:S06:T18)
Planning for: UXR-007
Canonical planning artifacts
- ICW-E7S06T18-specification.md — requirements, success criteria, as-delivered verification (
v0.7.6.18+1). - ICW-E7S06T18-test-design.md — T1–T9 and automated coverage notes.
- ICW-E7S06T18-implementation-plan.md — ordered actions and files touched.
This file remains as a stable redirect from historical links to the monolithic IPW filename.