Task E5:S01:T73 – FR/BR/UXR Board: Open ∧ Taskless Intake Execution Plan

Task ID: E5:S01:T73
Status: COMPLETE
Priority: MEDIUM
Version Anchor: v0.5.1.73+0 (doc-init) · Phase B/C closed v0.5.1.74+2 (internal VERSION_TASK stays T74 for monotonicity; see detailed changelog)
Feature Request: FR-073 – FR/BR/UXR board intake execution plan


Summary

Own the Intake plan block on fbuboard.md: definition of open ∧ taskless, epic branch + RW -k loop, MoSCOW queue table, hygiene rules, and execution order. Deliver concrete, repeatable steps so agents and humans can drain the queue without orphan documentation.


Scope

Documentation-only ownership of the FR/BR/UXR intake execution plan on the prioritization board: definitions, pre-identified FR/BR/UXR→task mapping, housing policy for story choice, phased execution (A/B/C), and hygiene notes. Out of scope: implementing ICW code (FR-040), fixing BR-039 product behavior, or automating UKW (other tasks).


Input


Pre-identified task mapping (Must / Should queue)

Rule: IDs below are proposed reservations for RW -k doc-init or board-refresh work. If you renumber, update fbuboard.md, this task, and FR-073 together.

FR/BR/UXRTypePrimary task IDStatusPrimary epic branchHousing rationale
BR-038BRE6:S06:T02Linked (MoSCOW **`T02`** 2026-03-31)epic/6-framework-management
BR-039BRE6:S06:T57Released v0.6.6.57+1 on epic/6 (supersedes planning alias T43 on older board drafts)epic/6-framework-managementCanonical task doc: T57.
BR-059BRE6:S07:T109Released v0.6.7.109+1 on epic/6 (RW -k)epic/6-framework-managementT109-br059.
FR-040 (ICW)FRE5:S01:T40Linkedepic/5-documentation-managementT40; board MoSCOW pipe added 2026-03-31.
UXR-001UXRE7:S00:T01 · E7:S05:T01Filedepic/7-documentation-maintenanceT01 repo; S05:T01 synthesis complete.
UXR-002UXRE7:S00:T02 · E7:S05:T02Filedepic/7-documentation-maintenanceT02 repo; S05:T02 synthesis complete.
UXR-005UXRE7:S00:T05 · E7:S01:T09Filedepic/7-documentation-maintenanceT05 repo; E07S01T09.
FR-073FRE5:S01:T73This taskepic/5-documentation-managementMeta intake-plan FR; FR Repo.

Story-choice policy (shortcut)

Governance: KG-R6 — prefer semantic story placement; FR-nnn ↔ Tnn in E5:S01 is optional, not mandatory.

  • E5:S01 — Often used for FR repository rows and RW -k doc-init; primary delivery task may still live under another epic/story with links.
  • E6:S06 — Typical framework / RW–adjacent BR and FR implementation.
  • E6:S07UKW / CMW / RW maintenance defects and perpetual workflow tasks.
  • E7:S00 / E7:S01 / E7:S05 — UXR repository slot vs implementation per project Story-000 / charter; link both when both exist.

Concrete plan (phased)

Phase A — Filing and traceability (this intake)

StepActionDone
A1FR-073 + T73 + Story-001 checklist row[x]
A2Board Intake plan header: Kanban anchor → FR-073 / T73[x]
A3MoSCOW Should row for FR-073 with `E5:S01:T73`
A4RW -k E5:S01:T73 on epic/5-documentation-management[x]

Phase B — Queue execution (ongoing)

StepActionDone
B1For each Must item: implementation epic branch → task doc → RW -k → update board line with **`E…`**
B2Should: FR-040 (ICW), UXR reconciliation per board table[x] FR-040 MoSCOW T40 link; E7:S00:T01/T02/T05 repo task docs + UXR headers + Story-000 checklist.
B3After each intake: refresh taskless table if the item moved to linked[x] Board MoSCOW queue subsection + MoSCOW bullets updated.

Phase C — Hygiene passes (scheduled / UKW)

StepActionDone
C1Reconcile UXR-001 / 002 / 005 board lines vs epics/Epic-7/ (no duplicate E7:S00:Txx without decision)[x] Repo anchors created under Story-000-uxr-repo/; impl pointers E7:S05 / E7:S01:T09 documented.
C2Update Board Statistics (counts, priority buckets) when MoSCOW changes[x] Note added under statistics (full recount deferred to UKW).
C3Batch-add Implementing Task: to high-traffic FRs when touching them (optional stretch)[x] 2026-03-31: RW -k E5:S01:T21/T32; RW -k E7:S00:T03/T04 on epic/7; residual Could rows backlog

Deliverable

  1. Intake plan section remains the single narrative SoT for the open∧taskless + RW -k loop; FR-073 cites scope only.
  2. MoSCOW FR-073 row tracks visibility until Phase B/C yields a “maintenance only” state (then FR may move toward COMPLETE in a later build).
  3. Version markers on board Last Updated line updated when this task ships substantive doc changes (via RW).

Acceptance Criteria

  • AC1: FR-073T73 bidirectional; Story-001 checklist includes T73.
  • AC2: fbuboard.md Intake plan references FR-073 / E5:S01:T73.
  • AC3: At least one RW -k: 0.5.1.73+0 (or subsequent +n) attributes filing to T73.
  • AC4: MoSCOW lists FR-073 with task link.
  • AC5: Phase B/C checklists in this doc updated when major queue milestones complete (honor clause — update table dates in board footer).
  • AC6: Pre-identified mapping in this doc matches fbuboard.md Intake plan table whenever either changes. (Aligned 2026-03-31 Phase B/C pass.)