Task E7:S00:T01 – UXR-001 Repository Anchor
Task ID: E7:S00:T01
Status: TODO
Priority: HIGH
Version Anchor: (pending — RW -k E7:S00:T01 on epic/7-documentation-maintenance when ready)
UXR: UXR-001
Implementation / synthesis (exists): E7:S05:T01 — completed synthesis
Scope
Canonical repository task for UXR-001 per Story-000-uxr-repo (1:1 UXR number ↔ E7:S00:Tnn). Holds intake/version anchors and bidirectional links; synthesis lives under E7:S05.
Input
- UXR-001
- Story-005 – Migration UXR T01 section
Deliverable
- Intake-complete headers on UXR + this task;
RW -kwhen first versioned release is needed for repo slot. - Cross-links: UXR-001 ↔ T01 ↔ E7:S05:T01 maintained on board and FR/UXR board.
Acceptance Criteria
- AC1: Task doc exists under E7:S00 with required sections.
- AC2: UXR-001 header lists Repository Task E7:S00:T01.
- AC3:
fbuboard.mdMoSCOW row lists both S00:T01 and implementation pointer E7:S05:T01.
Dependencies
Related: E7:S05:T01 (implementation complete — historical).