Skip to main content

Epic 5, Story 1, Task 75: ICW durable planning artifacts in the documentation system

Task ID: E5:S01:T75
Status: ✅ COMPLETE
Priority: MEDIUM
Estimated Effort: Small (documentation + governance; optional RW)
Created: 2026-04-01
Completed: 2026-04-01
Last updated: 2026-04-01 — RW E5:S01:T75 v0.5.1.75+1 (FR-075)
Code: E5S01T75
Version anchor: ✅ COMPLETE (v0.5.1.75+1)

Repository pattern: FR-075 = E5:S01:T75


Task ID

Full Task ID: E5:S01:T75


Scope

Deliver FR-075: codify that ICW persists spec / test design / implementation plan under docs/implementation-cycles/ (or project icw-workflow.yaml output_dir), links them from the Kanban task, and does not treat IDE-only plan folders as system of record. Ship policy, framework ICW docs, icw-workflow.yaml comment, .cursorrules ICW steps, and implementation-cycles README.


Input

  • FR: FR-075
  • Prior art: FR-040, FR-048
  • Existing ICW output config: packages/frameworks/workflow mgt/workflows/implementation-cycle-workflow/icw-workflow.yaml

Deliverable

ArtifactPath
Policydocs/architecture/standards-and-adrs/specification-and-planning-artifacts-policy.md
Implementation cycles indexdocs/implementation-cycles/README.md
ICW framework README sectionpackages/frameworks/workflow mgt/workflows/implementation-cycle-workflow/README.md
ICW guidepackages/frameworks/workflow mgt/docs/implementation-cycle-workflow-guide.md
YAML commentpackages/frameworks/workflow mgt/workflows/implementation-cycle-workflow/icw-workflow.yaml
Agent rules.cursorrules (ICW trigger + Kanban integration bullet)

Release: Land via RW on the appropriate branch; set Version anchor on this task per validator when marking COMPLETE.


Acceptance Criteria

  • FR-075:R01–R06 satisfied (files present; mutual links sane).
  • FR-075 acceptance criteria checked and status advanced when done.
  • Task Version anchor ✅ COMPLETE (v0.5.1.75+1).