Task T06 – CMW Epic 5 execution context (FR-063)
Task ID: E5:S02:T06
Status: ✅ COMPLETE (intake + CMW baseline; FR-063 R01–R04 implementation follow-up)
Priority: MEDIUM
Estimated Effort: Medium (1–2 days)
Created: 2026-03-25
Last updated: 2026-03-25 (v0.5.2.6+1 – RW)
Associated FR: FR-063
Task ID
Format: E\{epic\}:S\{story\}:T\{task\}
Full Task ID: E5:S02:T06
Repository Pattern: FR-063 = E5:S02:T06
Scope
Implement FR-063: document and enforce Epic 5 execution context for standalone Changelog Management Workflow (CMW) so branch/version.py alignment matches Release Workflow (RW) branch safety, while RW Step 9.5 continues to run CMW on the active RW epic branch.
Includes:
- Documentation updates (CMW workflow YAML,
scripts/changelog/README.md,.cursor/skills/cmw-maintain/SKILL.md, RW Step 9.5 / agent execution guide). cmw.py(or helper): blocking precondition for standalone runs; opt-out / flag for RW Step 9.5 caller.rw-config.yaml/cmw-config: configurable required epic and branch pattern; documented adopter overrides.
Coordinates with: E6:S07:T102 (perpetual CMW maintenance — reconcile messaging in docs).
Input
- FR-063
packages/frameworks/workflow mgt/scripts/changelog/cmw.pypackages/frameworks/workflow mgt/scripts/validation/validate_branch_context.py- Epic 5 branch:
epic/5-documentation-management(Epic-5.md)
Deliverable
Shipped (v0.5.2.6+1):
- FR-063 filed; implementing task linked; prioritization board + Epic 5 story updated.
- CMW (
latest_only) executed onepic/5-documentation-management(main changelog +CHANGELOG_ARCHIVE.md).
Follow-up (FR-063 / future build):
- Standalone
cmw.pyfails fast when branch/version epic ≠ configured Epic 5 context (with clear errors). - RW Step 9.5 path documented and implemented (no false E5 requirement during RW on other epics).
- Config keys and defaults documented for ai-dev-kit and adopters.
- All FR-063 documentation requirements satisfied (packaged workflow YAML, skill, execution guide).
Acceptance Criteria
- Task listed in Story-002-documentation-maintenance-framework.md checklist; FR-063 links to this task.
- FR-063 acceptance criteria AC1–AC4 satisfied (see FR) — implementation pending.
Version Anchor
Forensic Marker: ✅ COMPLETE (v0.5.2.6+1) — intake + CMW baseline only.
References
- FR-063: FR-063-cmw-epic-5-execution-context.md
- CMW perpetual task: T102 — CMW