Skip to main content

Task 006 – Update RW workflow YAML and documentation

Task: E2:S02:T06
Status: TODO
Priority: HIGH
Created: 2025-12-03
Story: Story 002 – PDCA Integration into Release Workflow


Overview

Update the Release Workflow YAML and all related documentation to reflect the complete PDCA integration, including Steps 12-13, enhanced PLAN and DO phases, and all templates and examples.


Input

  • All previous task deliverables (T01-T05)
  • Current RW workflow YAML: packages/frameworks/workflow mgt/workflows/release-workflow.yaml
  • Current RW documentation
  • PDCA integration plan: docs/architecture/standards-and-adrs/rw-pdca-integration-plan.md

Deliverable

  • Updated workflow YAML with Steps 12-13
  • Updated workflow reference documentation
  • Updated README
  • Migration guide for existing projects
  • Updated cross-references
  • Validated workflow structure

Approach

  1. Update Workflow YAML:

    • Add Steps 12-13 to release-workflow.yaml
    • Update step dependencies
    • Update workflow version
    • Validate YAML structure
  2. Update Workflow Reference:

    • Update release-workflow-reference.md
    • Add Steps 12-13 documentation
    • Update step count (11 → 13)
    • Update dependency graph
    • Update execution phases
  3. Update README:

    • Update workflow description
    • Add PDCA cycle information
    • Update step count
    • Add PDCA benefits
  4. Create Migration Guide:

    • Guide for existing projects
    • Step-by-step migration instructions
    • Backward compatibility notes
    • Common issues and solutions
  5. Update Cross-References:

    • Update all references to RW steps
    • Update step count references
    • Update workflow structure references
    • Update examples
  6. Validate Workflow Structure:

    • Validate YAML syntax
    • Validate step dependencies
    • Validate workflow completeness
    • Test workflow execution

Acceptance Criteria

  • Workflow YAML updated with Steps 12-13
  • Reference documentation updated
  • README updated
  • Migration guide created
  • Cross-references updated
  • Workflow structure validated
  • All documentation consistent
  • Backward compatibility maintained where possible

  • E2:S02:T01 – Add CHECK Phase (provides Step 12 content)
  • E2:S02:T02 – Add ACT Phase (provides Step 13 content)
  • E2:S02:T03 – Enhance PLAN Phase (provides PLAN enhancements)
  • E2:S02:T04 – Enhance DO Phase (provides DO enhancements)
  • E2:S02:T05 – Create PDCA templates and examples (provides templates)

References

  • PDCA Integration Plan: docs/architecture/standards-and-adrs/rw-pdca-integration-plan.md
  • RW Workflow YAML: packages/frameworks/workflow mgt/workflows/release-workflow.yaml
  • RW Reference: packages/frameworks/workflow mgt/docs/documentation/Developer_Docs/vwmp/release-workflow-reference.md
  • RW README: packages/frameworks/workflow mgt/README.md