Summary

When a task is planned via IPW and that plan is then built/implemented, task status and kboard.md frequently remain stale (TODO), creating a false project state. Add explicit lifecycle rules so status transitions are applied at the correct point and reflected on kboard as part of the same workflowed unit of work.


Problem Statement

Current process allows this drift pattern:

  1. IPW package is created and wired.
  2. Work is implemented from the IPW package.
  3. Task remains TODO in task doc and/or kboard.

This creates governance and traceability gaps because documentation no longer reflects actual execution state.

Latest observed incident (2026-04-10)

  • During IPW E3:S02:T12 -> implementation -> RW E3:S02:T12 --art, task E3:S02:T12 remained TODO until manually corrected.
  • RW Step 1c failed gating (validate_rw_task_complete.py) because the host task status had not transitioned despite implementation evidence.
  • This confirms FR-077 remains an active operational defect path (not just documentation ambiguity).

Core Questions to Resolve

  1. When should status change from TODO to IN PROGRESS?
  2. When should status change to COMPLETE?
  3. Which workflow step is responsible for propagating task status changes to kboard and related board views?

Proposed Direction

  1. Define a canonical status transition contract:
    • TODO -> IN PROGRESS when implementation work starts (first non-planning implementation change).
    • IN PROGRESS -> COMPLETE when acceptance criteria are satisfied and evidence exists.
  2. Wire this intent into IPW and adjacent execution guidance:
    • IPW artifacts must include a "status transition intent" section.
    • Implementation and RW/UKW docs must state the authoritative update point and owner.
  3. Enforce atomic propagation:
    • Task doc status update and kboard representation update happen in the same change set/session.

Implemented decisions (2026-04-10)

  1. IPW ownership clarified: IPW planning docs now require a mandatory status-transition intent section.
  2. Transition owner clarified: Implementation execution (not planning-only IPW) owns first state transition from TODO.
  3. RW audit path added: RW execution guide now includes an IPW transition drift audit using validate_ipw_status_drift.py.
  4. Drift detector implemented: New validator scans IPW/ICW-derived task docs and fails when status remains TODO despite implementation evidence markers.

Additional hardening (2026-04-10 follow-up)

  1. Pre-gate enforcement moved earlier: RW Step 1c (validate_rw_task_complete.py) now performs FR-077 drift detection during releasability validation, so TODO+implementation evidence blocks with explicit drift reason before downstream steps.
  2. Task-scoped drift checks: validate_ipw_status_drift.py now supports --requested E:S:T to validate the requested task first, improving diagnostic precision and reducing noisy broad scans during RW gating.
  3. Diagnostic clarity: Step 1c failure output now explicitly distinguishes plain TODO from "TODO with implementation evidence (FR-077 drift)", with direct remediation guidance (transition to IN PROGRESS/COMPLETE).

Latest incident context (2026-04-13)

  1. Recurrence observed after active implementation: RW E7:S06:T18 --art was blocked at Step 1c because host task E7:S06:T18 remained TODO even after substantial implementation work and test execution.
  2. Operational impact: Release flow aborted until manual status update (TODO -> IN PROGRESS) was applied.
  3. Implication for FR-077 scope: Existing validator hardening correctly blocks drift, but execution ergonomics still depend on humans remembering transition timing. Additional proactive guardrails are needed to reduce repeat incidents.

Requirements

  • FR-077:R01 Define canonical status transition points for IPW-derived tasks.
  • FR-077:R02 Add status transition intent/checklist to IPW planning artifacts or workflow guidance.
  • FR-077:R03 Require task doc + kboard sync in one atomic update when status changes.
  • FR-077:R04 Update RW/UKW/IPW documentation to avoid ambiguous ownership of status propagation.
  • FR-077:R05 Add validation or audit checks to detect "implemented but TODO" drift.

Acceptance Criteria

  • Policy/docs explicitly define when TODO, IN PROGRESS, and COMPLETE are applied for IPW-derived tasks.
  • IPW output includes explicit status transition intent that downstream execution can apply.
  • At least one regression check identifies and reports stale TODO state after implementation evidence exists.
  • kboard and task-doc status remain synchronized for validated scenarios.

Release anchor (2026-04-14)

  • Released build: v0.2.1.17+3 (SemVer: v0.4.737+3) for implementing task E2:S01:T17.
  • Includes ownership-contract normalization (IPW/RW/UKW), deterministic requested-task drift checks, and recurrence regression tests (15 passed).

Execution notes

  • This item is currently tracked as FR-led implementation under E2:S01:T17 (no standalone BR currently owns the same scope).
  • If a dedicated BR is later introduced, it should be cross-linked here and made upstream to T17.

  • FR-042 - IPW workflow and planning artifacts
  • FR-075 - Durable planning artifacts
  • FR-076 - Drift/concurrency controls