Feature Request: Kanban Policy – Task Prioritisation and Queue/Stack Approaches

Type: Feature Request (FR)
Submitted: 2026-01-22
Submitted By: User
Priority: HIGH
Status: PENDING
Assigned Task: E5:S01:T37
GitHub Issue: [TBD]
Source: Adapted from Starborn Legacy Kanban Governance Policy (2025-12-01)


Summary

Update the ai-dev-kit Kanban governance policy to incorporate explicit guidance on how to prioritise tasks and queue vs stack semantics for the MUST HAVE section: treat MUST HAVE as a stack for bug-based (breaking) tasks (add to top; do first) and a queue for all other MUST HAVE tasks (add to end). Optionally incorporate a universal definition of COMPLETE (implemented and signed off).


Description

What is the Feature?

Extend the framework Kanban governance policy so that adopters have clear, reusable rules for:

  1. Task prioritisation – When to place tasks in M / S / C / O / W (with project-agnostic criteria and examples).
  2. MUST HAVE ordering – Two distinct behaviours within MUST HAVE:
    • Stack (LIFO) for bug-based / breaking tasks: new items added to top; work in first-in, first-done order (urgent bugs get done first).
    • Queue (FIFO) for all other MUST HAVE tasks: new items added to end; work in first-in, first-done order (planned work stays in sequence).
  3. Definition of COMPLETE (optional but recommended) – COMPLETE means the task is fully implemented (work done, delivered, released) and signed off (validated, accepted). Tasks move from a MoSCOW column into COMPLETE only when both conditions are met.

What Problem Does This Solve?

  • Current state: The framework policy describes MoSCOW categories and chronological ordering but does not define how to order within MUST HAVE or how to treat bugs vs regular work.
  • Gap: Adopters (e.g. Starborn Legacy) already use queue/stack semantics; the framework policy does not document this pattern, so each project reinvents or keeps it in local docs only.
  • Benefit: One canonical, portable policy that supports both “urgent bugs first” (stack) and “planned work in order” (queue) within MUST HAVE.

What is the Use Case?

  • Primary: A project uses MoSCOW and wants MUST HAVE to behave as: (1) a stack for breaking-bug tasks so the latest critical bug is done first, and (2) a queue for other MUST HAVE work so order is preserved.
  • Secondary: Same project wants a single, clear definition of COMPLETE (implemented + signed off) referenced by board, guide, and scripts.

Requirements

Functional Requirements

  • FR-037:R01 – Governance policy includes a “Task prioritisation” (or equivalent) section that explains:

    • When to assign M / S / C / O / W (project-agnostic criteria; projects may add domain-specific rules).
    • That all new tasks must be placed in a MoSCOW category first; no task is added directly to COMPLETE.
  • FR-037:R02 – Governance policy defines MUST HAVE ordering:

    • Stack (for bug-based / breaking tasks): Add to top of MUST HAVE; work top-first (e.g. “do first” = most recently added).
    • Queue (for all other MUST HAVE tasks): Add to end of MUST HAVE; work front-first (e.g. “do first” = first in list).
    • Clear rule: classify each new MUST HAVE task as either “bug-based/breaking” (stack) or “other” (queue) and add accordingly.
  • FR-037:R03 – Policy states that scripts and processes that update the MoSCOW section (e.g. UKW, RW) must respect stack vs queue when inserting or ordering tasks (or document that ordering is manual / agent-defined).

  • FR-037:R04 – (Optional) Policy includes a universal definition of COMPLETE: task is COMPLETE only when fully implemented (work done, code/docs delivered, released in a version) and signed off (validated, accepted by the responsible party). Tasks move from a MoSCOW column into COMPLETE only when both conditions are met.

  • FR-037:R05 – Kanban board guide template (or guide section in policy) is updated so that “how to prioritise” and “queue/stack for MUST HAVE” are discoverable (e.g. referenced from the board guide or governance policy).

Non-Functional Requirements

  • FR-037:NF01Portability: Wording is framework- and project-agnostic; projects may specialise (e.g. “gameplay-critical = M” for a game) without changing the core queue/stack rule.
  • FR-037:NF02Consistency: Policy aligns with existing MoSCOW section structure (M/S/C/O/W) and with FR-036 (board/guide split).
  • FR-037:NF03Clarity: Definitions are short and actionable so adopters and agents can apply them without ambiguity.

Scope Analysis

Problem Domain: Kanban governance, prioritisation, MoSCOW ordering
Affected Areas:

  • packages/frameworks/kanban/policies/kanban-governance-policy.md
  • Optionally: packages/frameworks/kanban/templates/KANBAN_BOARD_GUIDE_TEMPLATE.md (or equivalent) for “how to prioritise” and queue/stack
  • UKW / RW documentation if they reference “how MUST HAVE is ordered”

Estimated Complexity: Medium (policy and template edits; optional doc/script references).


Use Cases

Primary Use Case:
Product lead adds a critical bug to MUST HAVE and expects it to appear at the top (stack) so it’s done first; when adding a new feature task to MUST HAVE, they expect it at the end (queue) so planned order is preserved.

Additional Use Cases:

  • New adopter reads the framework policy and sees a single, clear rule for “bugs vs regular work” in MUST HAVE.
  • Script/agent that regenerates MoSCOW sections uses stack/queue rules to order tasks correctly.
  • Team marks a task COMPLETE only after implementation and sign-off, using the policy’s definition.

Acceptance Criteria

  • Governance policy contains an explicit “Task prioritisation” (or equivalent) section.
  • MUST HAVE is defined as: stack for bug-based/breaking tasks (add to top), queue for other MUST HAVE tasks (add to end).
  • Policy (or linked guide) states that all tasks are initially placed in a MoSCOW category; none are added directly to COMPLETE.
  • Optional: Universal definition of COMPLETE (implemented + signed off) is in the policy and referenced where COMPLETE is used.
  • Framework board/guide template or policy points adopters to “how to prioritise” and queue/stack behaviour.
  • No breaking change to existing MoSCOW section structure (M/S/C/O/W); only additive guidance.

Dependencies

Blocks:

  • Consistent, portable behaviour for MUST HAVE ordering across adopting projects
  • Clear COMPLETE semantics (if R04 is implemented)

Blocked By:

  • None

Related Work:

  • FR-036: Kanban Board Info-Only Split (board vs guide; guide can host “how to prioritise” and queue/stack details)
  • E4:S13: Kanban Board Enhancement - MoSCOW Prioritized Task View
  • Starborn Legacy: Kanban Governance Policy (2025-12-01) – source of queue/stack and COMPLETE definition

Source Material (Starborn Legacy)

The following wording is adapted from the Starborn Legacy Kanban Governance Policy (2025-12-01):

MoSCOW prioritisation and COMPLETE:

  • MoSCOW (Must, Should, Could, Ongoing, Won't); second O = ONGOING.
  • Prioritisation principle: Essential/critical work = MUST HAVE; clearly non-essential = SHOULD HAVE or lower (project-specific criteria can be added).
  • MUST HAVE ordering: Treat MUST HAVE as a stack for breaking-bug tasks (add to top; do first) and a queue for all other MUST HAVE tasks (add to end).
  • Rule: All tasks must initially be prioritised under MoSCOW; no task is added directly to COMPLETE.
  • Definition of COMPLETE (universal): Task is COMPLETE when fully implemented (work done, delivered, released) and signed off (validated, accepted). Only then does a task move from a MoSCOW column into COMPLETE.

Board and guide (two-file split):
Starborn also uses a board (structured info only) + guide (rules and explanations); this aligns with FR-036. The queue/stack and COMPLETE rules belong in the guide or governance policy so they are authoritative and portable.


Manual UAT Checklist (Post-Implementation)

  • Policy wording is project-agnostic
  • Board guide and governance policy agree on prioritisation and queue/stack
  • UKW/RW docs either implement stack/queue or document manual/agent-defined ordering
  • validate_kanban_governance_policy.py exits 0 when run from project root

Implementation Notes

  • Add a new section to kanban-governance-policy.md (e.g. “Task prioritisation and MUST HAVE ordering”) containing the queue/stack rule and optional COMPLETE definition.
  • Optionally add a short “Prioritisation” subsection to the board guide template (or policy) that references the governance policy and summarises stack vs queue.
  • Keep wording project-agnostic; allow projects to define “bug-based” / “breaking” and “other” in their own guide (e.g. “For this project, bug-based = any BR-linked task” or “breaking = P0 bugs only”).

References

  • Framework Kanban governance: packages/frameworks/kanban/policies/kanban-governance-policy.md
  • Board guide template: packages/frameworks/kanban/templates/KANBAN_BOARD_GUIDE_TEMPLATE.md
  • FR-036: Kanban Board Info-Only Split
  • Source: Starborn Legacy – Kanban Governance Policy (2025-12-01), “MoSCOW Prioritisation and COMPLETE” and “Board and Guide (Two-File Split)”

Release History

  • v0.5.1.37+3 (2026-02-12): Policy alignment with Starborn Legacy patterns. Delivered: policy comparison proposal (Starborn vs ai-dev-kit), Implementation Cycle (spec + TDD) as adoptable pattern with framework SoP, changelog language reminder, Step 9.6 IDE check, git reminder, perpetual-task document update requirement in Kanban Governance. See CHANGELOG_v0.5.1.37+3 (source).

This Feature Request is part of the Kanban Framework. See packages/frameworks/kanban/ for complete framework documentation.