Skip to main content

Epic 7, Story 6: Post-Windsurf Project Review

Status: ✅ COMPLETE Priority: HIGH
Last updated: 2026-04-13 (v0.7.6.18+3 – Kanban documentation setup) Estimated Effort: [TBD]
Actual Effort: [TBD]
Started: [TBD]
Completed: 2026-04-13 Version: v0.7.6.18+3 Code: E7S06


Task Checklist

  • E7:S06:T10 – Review RW workflow (Windsurf impact) ✅ COMPLETE (v0.7.6.10+4)
  • E7:S06:T11 – Review UKW workflow (Windsurf impact) ✅ COMPLETE (v0.7.6.11+3)
  • E7:S06:T12 – Review CMW workflow (Windsurf impact) ✅ COMPLETE (v0.7.6.12+3)
  • E7:S06:T13 – Review PVW workflow (Windsurf impact) ✅ COMPLETE (v0.7.6.13+3)
  • E7:S06:T14 – Review ICW workflow (Windsurf impact) ✅ COMPLETE (v0.7.6.14+3)
  • E7:S06:T15 – Review Intake workflow (Windsurf impact) ✅ COMPLETE (v0.7.6.15+3)
  • E7:S06:T16 – Review PIR workflow (Windsurf impact) ✅ COMPLETE (v0.7.6.16+3)
  • E7:S06:T17 – Retrospective BR-057 / fr-br-intake.yml YAML block scalar fix ✅ COMPLETE (v0.7.6.17+1)
  • E7:S06:T01 – Windsurf artifact cleanup ✅ COMPLETE (v0.7.6.1+1)
  • E7:S06:T02 – Version and changelog alignment ✅ COMPLETE (v0.7.6.2+2 – MoSCOW task-level rows, guide, T02 doc)
  • E7:S06:T03 – Kanban documentation consistency ✅ COMPLETE (v0.7.6.3+1 – live SoT, E9/E18 disambiguation, structure links, Epic-9 S05 stub)
  • E7:S06:T04 – Recent commit review ✅ COMPLETE (v0.7.6.4+1)
  • E7:S06:T05 – Workflow script integrity ✅ COMPLETE (v0.7.6.5+1)
  • E7:S06:T06 – FR/BR/UXR intake documentation quality ✅ COMPLETE (v0.7.6.6+1)
  • E7:S06:T07 – General documentation and cross-reference integrity ✅ COMPLETE (v0.7.6.7+1)
  • E7:S06:T08 – Dependency and tooling audit ✅ COMPLETE (v0.7.6.8+1)
  • E7:S06:T09 – Config and git state validation ✅ COMPLETE (v0.7.6.9+1)
  • E7:S06:T18 – Interactive installer Kanban pattern prompt clarity (UXR-007) ✅ COMPLETE (0.7.6.18+3 — RW full traceability)

Format: Exx:Sxx:Txx (Epic, Story, Task with 2-digit zero padding)
Forensic Marker Format: ✅ COMPLETE (vRC.E.S.T+B)
Release Workflow Requirement: When RW Step 7 updates this Epic, it MUST update ALL sections (Epic header, Story Checklist, detailed sections, this Story file).


Overview

Systematic review of project state after the Windsurf evaluation period. Decomposes review by dimension (artifacts, versioning, kanban, commits, scripts, docs) into discrete tasks to assess and remediate any degradation left by Windsurf's AI models.


Goals

  • Remove Windsurf artifacts and restore Cursor-native state (T01 complete)
  • Align version, changelog, and kanban to a single coherent state (E7:S06:T02–T09 + RW discipline)
  • Validate kanban documentation against live SoT (E7:S06:T03 v0.7.6.3+1)
  • Review recent commits for RW compliance and quality (E7:S06:T04 v0.7.6.4+1)
  • Verify workflow script changes are correct and coherent (E7:S06:T05 v0.7.6.5+1)
  • Audit FR/BR/UXR intake documentation consistency (E7:S06:T06 v0.7.6.6+1)
  • Ensure general documentation and cross-references are intact (E7:S06:T07 v0.7.6.7+1)
  • Audit dependencies, tests, CI/CD, and build scripts (E7:S06:T08 v0.7.6.8+1)
  • Validate config drift and git state (E7:S06:T09 v0.7.6.9+1)

Tasks

E7:S06:T10–T16 – Workflow Windsurf impact reviews (parallel)

Seven review tasks, one per workflow: RW, UKW, CMW, PVW, ICW, Intake, PIR. Each produces: Windsurf impact assessment; .windsurf skill mappings; migration plan for T01. Can run in parallel. See individual task docs in Story-006-post-windsurf-project-review/.


E7:S06:T17 – Retrospective BR-057: fr-br-intake workflow YAML

Input: GitHub “Invalid workflow file” on fr-br-intake.yml; prior agent fix to script: | indentation
Deliverable: BR-057; task doc T17-BR057-fr-br-intake-yaml-retrospective.md; traceability for RW
Dependencies: None
Blocker: None


E7:S06:T01 – Windsurf artifact cleanup

Input: Repo filesystem; review outputs from T10–T16
Deliverable: .windsurf/ removed (or moved to .gitignore if needed); skills migrated to .cursor/skills/; no Windsurf-specific references in tracked files
Dependencies: T10, T11, T12, T13, T14, T15, T16
Blocker: T01 blocked until T10–T16 complete


E7:S06:T02 – Version and changelog alignment

Input: version.py, kboard.md, CHANGELOG.md, branch context
Deliverable: Single coherent version; CHANGELOG and kanban board match; branch aligned
Dependencies: None
Blocker: None


E7:S06:T03 – Kanban documentation consistency

Input: docs/project-management/kanban/**, kanban-structure.md, historical/adopter docs that mention E9/E18 swaps
Deliverable: Live kanban narrative matches SoT; critical broken links fixed; template/UAT docs disambiguated where they imply ADK live numbering
Dependencies: None
Blocker: None


E7:S06:T04 – Recent commit review

Input: Last ~15 commits (git log)
Deliverable: Findings documented; RW compliance noted; batch-commit risks assessed; BR/FR filed for defects
Dependencies: None
Blocker: None


E7:S06:T05 – Workflow script integrity

Input: ukw_syntax_parser.py, task_inference.py, workflow_orchestrator.py, workflow_executor.py
Deliverable: Scripts reviewed; behavior validated; BR filed for bugs
Dependencies: None
Blocker: None


E7:S06:T06 – FR/BR/UXR intake documentation quality

Input: Batch 3 intake docs, fr-br-uxr-structure.md, kanban-completed.md
Deliverable: Consistency checked; format validated; gaps documented
Dependencies: None
Blocker: None


E7:S06:T07 – General documentation and cross-reference integrity

Input: README, docs/ tree, internal links
Deliverable: Broken links fixed; structure validated; inconsistencies documented
Dependencies: None
Blocker: None


E7:S06:T08 – Dependency and tooling audit

Input: pyproject.toml, requirements, package manifests, test suite, CI configs, build scripts
Deliverable: Dependency health report; test suite status; CI/CD validation; build script review; BR filed for issues
Dependencies: None
Blocker: None


E7:S06:T09 – Config and git state validation

Input: rw-config.yaml, version.py, .cursorrules, .cursorignore, git status, branch/tag state
Deliverable: Config drift documented; git state baseline; cursor rules aligned with workflows
Dependencies: None
Blocker: None


Acceptance Criteria

  • All review tasks completed with findings documented (through T09; Story COMPLETE v0.7.6.9+1)
  • Critical issues (artifacts, version drift) remediated
  • Non-critical findings filed as BR/FR where appropriate
  • Project in known-good state before new feature work

Parallel Development Dependencies

  • Epic 4 (Kanban Framework) – Uses kanban structure
  • Epic 2 (Workflow Management) – Workflow scripts under review
  • Epic 3 (Versioning) – Version alignment
  • Parallel Development Candidacy: Safe (review is independent)

References

  • Project review discussion (2026-03-18)
  • Epic 7: Codebase Maintenance and Review
  • Kanban Governance Policy
  • Dev Kit Versioning Policy