Epic 6, Story 6, Task 61: UXR-006 — MoSCOW row last-modified UTC stamps
Task ID: E6:S06:T61
Status: IN PROGRESS
Priority: HIGH
Estimated Effort: Small
Created: 2026-04-02
Last updated: 2026-04-02 — RW v0.6.6.61+1 (SemVer v0.4.702+1); intent guard T61 with --confirmed-override (prior version.py T57)
Version: v0.6.6.61+1
Code: E6S06T61
Upstream: UXR-006 — Kanban MoSCOW row last-modified UTC stamp
Registry: E7:S00:T06
Input
- UXR-006 (acceptance criteria and recommendations).
kboard.md,fbuboard.md,kanban-board-guide.md.
Scope
- Ensure every open MoSCOW line on the task board and FR/BR/UXR board ends with
| Last modified: YYYY-MM-DD HH:MM UTC(final pipe segment). - Document derivation (git on first linked
.mdvs manual refresh) and UKW / RW Step 7 expectations. - Optional: add repeatable tooling under
scripts/or workflow framework for drift checks (AC-4).
Deliverable
- Board rows and guide aligned with UXR AC-1–AC-3 and AC-5.
- Optional AC-4 tracked as follow-up in UXR checklist if not done in this task.
Acceptance Criteria
- AC1: Task board MoSCOW rows carry the
Last modifiedfield as specified in the guide. - AC2: FR/BR/UXR board MoSCOW rows carry the same field.
- AC3:
kanban-board-guide.mdincludes the MoSCOWLast modifiedsubsection. - AC4: (Optional) Script or validator checked in and referenced from guide or UXR.
- AC5: Intake: UXR ↔ this task ↔ E7:S00:T06; story checklist and boards list E6:S06:T61.
Dependencies
Blocks: None.
Blocked by: None.
Related: UXR-005 (board governance).