Skip to main content

Epic 6, Story 6, Task 61: UXR-006 — MoSCOW row last-modified UTC stamps

Task ID: E6:S06:T61
Status: IN PROGRESS
Priority: HIGH
Estimated Effort: Small
Created: 2026-04-02
Last updated: 2026-04-02 — RW v0.6.6.61+1 (SemVer v0.4.702+1); intent guard T61 with --confirmed-override (prior version.py T57)
Version: v0.6.6.61+1
Code: E6S06T61

Upstream: UXR-006 — Kanban MoSCOW row last-modified UTC stamp

Registry: E7:S00:T06


Input

  • UXR-006 (acceptance criteria and recommendations).
  • kboard.md, fbuboard.md, kanban-board-guide.md.

Scope

  1. Ensure every open MoSCOW line on the task board and FR/BR/UXR board ends with
    | Last modified: YYYY-MM-DD HH:MM UTC (final pipe segment).
  2. Document derivation (git on first linked .md vs manual refresh) and UKW / RW Step 7 expectations.
  3. Optional: add repeatable tooling under scripts/ or workflow framework for drift checks (AC-4).

Deliverable

  • Board rows and guide aligned with UXR AC-1–AC-3 and AC-5.
  • Optional AC-4 tracked as follow-up in UXR checklist if not done in this task.

Acceptance Criteria

  • AC1: Task board MoSCOW rows carry the Last modified field as specified in the guide.
  • AC2: FR/BR/UXR board MoSCOW rows carry the same field.
  • AC3: kanban-board-guide.md includes the MoSCOW Last modified subsection.
  • AC4: (Optional) Script or validator checked in and referenced from guide or UXR.
  • AC5: Intake: UXR ↔ this task ↔ E7:S00:T06; story checklist and boards list E6:S06:T61.

Dependencies

Blocks: None.
Blocked by: None.

Related: UXR-005 (board governance).