Story 005 – Tooling & Automation Package Installation Evaluation
Status: TODO
Priority: HIGH
Estimated Effort: [TBD]
Created: 2026-01-18
Last updated: 2026-01-18 (v0.8.5.0+0 – Story created)
Version: v0.8.5.0+0
Code: E8S05
Task Checklist
- E8:S05:T01 – Enumerate supported installation paths for Tooling & Automation - TODO
- E8:S05:T02 – Validate fresh install steps for each path - TODO
- E8:S05:T03 – Validate migration/update paths (if supported) - TODO
- E8:S05:T04 – Verify post-install configuration and validation steps - TODO
- E8:S05:T05 – Document failure modes and rollback guidance - TODO
- E8:S05:T06 – Capture documentation gaps and improvements - TODO
Overview
This story evaluates all installation paths for the Tooling & Automation framework package (packages/frameworks/tooling & automation/) to ensure each path is documented, reproducible, and RC-ready.
Goal
Provide a complete installation evaluation with step-by-step verification, gaps, and remediation tasks for RC sign-off.
Tasks
E8:S05:T01 – Enumerate supported installation paths for Tooling & Automation
Input: Installation guides and scripts
Deliverable: Enumerated installation path list
Approach: Identify release, submodule, and CLI paths (as applicable).
E8:S05:T02 – Validate fresh install steps for each path
Input: Installation steps
Deliverable: Step-by-step validation log
Approach: Validate each step on a clean environment.
E8:S05:T03 – Validate migration/update paths (if supported)
Input: Migration/update guidance
Deliverable: Migration validation notes
Approach: Test upgrades and verify preserved behavior.
E8:S05:T04 – Verify post-install configuration and validation steps
Input: README and validation scripts
Deliverable: Post-install checklist and results
Approach: Verify configs, validators, and expected outputs.
E8:S05:T05 – Document failure modes and rollback guidance
Input: Installer behavior and logs
Deliverable: Failure mode list and rollback steps
Approach: Capture errors, troubleshooting, and recovery paths.
E8:S05:T06 – Capture documentation gaps and improvements
Input: Findings from T01–T05
Deliverable: Documentation gap list and remediation tasks
Approach: Record missing or unclear instructions.
Acceptance Criteria
- Installation paths enumerated and verified.
- Fresh install steps documented with results.
- Migration/update steps validated or explicitly unsupported.
- Post-install configuration checklist verified.
- Failure modes and rollback guidance documented.
- Documentation gaps recorded with remediation tasks.
Dependencies
- None (RC readiness prerequisite for Epic 8 package sign-off).
References
- Package:
packages/frameworks/tooling & automation/