Epic 6, Story 1, Task 36: RW Step 7 Board Update Bugs

Status: ✅ COMPLETE
Priority: HIGH
Last updated: 2026-01-22 (v0.6.1.36+1 – Bug report and task documentation release)
Started: 2026-01-22
Completed: 2026-01-22
Version: v0.6.1.36+1
Code: E6S01T36

Repository Pattern: BR-036 = E6:S01:T36 (abstract space: v0.6.1.36+0, fixed: v0.5.1.34+2)


Task ID

Format: E\{epic\}:S\{story\}:T\{task\}

Full Task ID: E6:S01:T36


Scope

Fix critical bugs in RW Step 7 (Auto-update Kanban Docs) that prevent the Kanban board from being updated automatically. The bugs include story document path resolution failures, board path resolution failures, and missing MoSCOW section update functionality.

Problem Statement:

  • RW Step 7 fails to find story documents (glob pattern issue)
  • RW Step 7 fails to resolve board path (path construction issue)
  • MoSCOW sections are not updated when tasks complete (missing functionality)
  • Board remains out of sync with task completion status

Solution:

  • Fix story document path resolution in resolve_kanban_paths()
  • Fix board path resolution with proper absolute path handling
  • Add MoSCOW section update functionality to update_kanban_board()
  • Ensure all path resolution works correctly for all epic/story combinations

Input


Deliverable

Fixed RW Step 7 Script that:

  1. Correctly finds story documents using glob patterns
  2. Correctly resolves board path
  3. Updates MoSCOW sections when tasks are completed
  4. Works reliably across all projects using the framework

Acceptance Criteria

  • Criterion 1: Story document path resolution works correctly ✅
  • Criterion 2: Board path resolution works correctly ✅
  • Criterion 3: MoSCOW section updates work correctly ✅
  • Criterion 4: Completed tasks show as COMPLETE in MoSCOW sections ✅
  • Criterion 5: Board metadata (Last Updated, Version) updates correctly ✅
  • Criterion 6: Script runs successfully end-to-end ✅
  • Criterion 7: All bugs from BR-036 are fixed ✅

Approach

Step 1: Fix Story Document Path Resolution

  • Analyze glob pattern construction issue
  • Fix path resolution to use parent directory and filename separately
  • Test with various epic/story combinations

Step 2: Fix Board Path Resolution

  • Analyze path construction and existence checking
  • Fix absolute/relative path handling
  • Ensure board path is resolved correctly

Step 3: Add MoSCOW Section Updates

  • Implement MoSCOW task pattern matching
  • Add status update logic (TODO/IN PROGRESS → COMPLETE)
  • Add version marker insertion
  • Test with completed tasks

Step 4: Validate Fixes

  • Test script with various scenarios
  • Verify all path resolutions work
  • Verify MoSCOW updates work correctly
  • Verify board updates are complete

Dependencies

Depends On:

  • FR-036/E5:S01:T36 implementation (original feature)
  • RW Step 7 script infrastructure

Blocks:

  • Accurate Kanban board status synchronization
  • Automated board updates in RW

Blocked By:

  • None

Related Work:

  • BR-036: RW Step 7 Board Update Bugs (this bug report)
  • FR-040: RW Update Kanban Board on Task Completion (original feature)
  • E5:S01:T36: RW Update Kanban Board on Task Completion (original implementation)

Version Anchor

Forensic Marker Format: ✅ COMPLETE (vRC.E.S.T+B) (e.g., ✅ COMPLETE (v0.5.1.34+2))

When Task is Complete:

  • Add forensic marker to Task document
  • Add forensic marker to Story checklist
  • Update Last updated field
  • Update Completed field
  • Update Status to COMPLETE
  • Update Version to final version
  • Update BR-036 with fix status

Implementation Progress

Bug Fix Complete (v0.5.1.34+2)

Date: 2026-01-22

Completed:

  1. Fixed Story Document Path Resolution:

    • Corrected glob pattern to use parent directory and filename separately
    • Fixed absolute/relative path handling in resolve_kanban_paths()
    • Story documents now found correctly
  2. Fixed Board Path Resolution:

    • Improved path construction and existence checking
    • Added proper absolute path resolution
    • Board path now resolved correctly
  3. Added MoSCOW Section Updates:

    • Implemented MoSCOW task pattern matching with correct regex
    • Added status update logic (TODO/IN PROGRESS → COMPLETE)
    • Added version marker insertion
    • MoSCOW sections now update automatically

Key Fixes:

  • Path resolution now works correctly for all epic/story combinations
  • Board updates work automatically on every RW execution
  • MoSCOW sections reflect task completion status immediately
  • All bugs from BR-036 are resolved

Notes

Bug Discovery:

  • Bugs were discovered when RW was run after completing E5:S01:T34
  • Board showed task as TODO even though it was COMPLETE
  • Investigation revealed path resolution and MoSCOW update bugs

Fix Strategy:

  • Fixed path resolution bugs first (blocking issues)
  • Added MoSCOW update functionality (missing feature)
  • Tested with actual RW execution to verify fixes

Related:

  • This bug fix is part of the same release as the original feature (E5:S01:T34)
  • Fixes ensure FR-036/E5:S01:T36 functionality works as intended

This Task is part of Epic 6, Story 1: BR Repo. See Story-001-br-repo.md for repository context.