Story 004 – Numbering & Versioning Package Implementation Review
Status: IN PROGRESS
Priority: HIGH
Estimated Effort: [TBD]
Created: 2026-01-18
Last updated: 2026-01-22 (v0.3.4.6+1 – T06: RC sign-off criteria and remediation tasks complete)
Version: v0.3.4.6+1
Code: E3S04
Task Checklist
-
E3:S04:T01 – Establish expectations baseline for Numbering & Versioning package - ✅ COMPLETE (v0.3.4.1+1)
- Task Doc:
T01-expectations-baseline.md
- Task Doc:
-
E3:S04:T02 – Inventory package components and map to expectations - ✅ COMPLETE (v0.3.4.2+1)
- Task Doc:
T02-component-inventory.md
- Task Doc:
-
E3:S04:T03 – Validate versioning behavior against documented guidance - ✅ COMPLETE (v0.3.4.3+1)
- Task Doc:
T03-versioning-behavior-validation.md
- Task Doc:
-
E3:S04:T04 – Review integrations and dependency alignment - ✅ COMPLETE (v0.3.4.4+1)
-
E3:S04:T05 – Create gap log and risk assessment - ✅ COMPLETE (v0.3.4.5+1)
- Task Doc:
T05-gap-log-and-risk-assessment.md
- Task Doc:
-
E3:S04:T06 – Define RC sign-off criteria and remediation tasks - ✅ COMPLETE (v0.3.4.6+1)
Overview
This story performs the RC readiness implementation review for the Numbering & Versioning framework package (packages/frameworks/numbering & versioning/).
Goal
Provide a complete implementation review, evidence, and remediation plan to support RC sign-off for the Numbering & Versioning framework.
Doc-Init / Abstract Space Quick Reference
For this story, doc-init (+0) builds are used for documentation-only anchors when first creating E/S/T docs (see dev-kit versioning policy, Section 6.2/6.3):
-
Abstract space (
+0):- Epic / Story / Task document creation only (no functional work yet).
- Typical use case: onboarding an FR/BR, creating the associated Task doc and wiring, before any implementation.
-
Functional work (
+1and beyond):- First functional release for that Task uses
+1; subsequent releases increment to+2,+3, etc.
- First functional release for that Task uses
This implementation review (E3:S04) assumes that abstract spaces are established via the +0 doc-init path, and that all RC readiness checks (T01–T06) evaluate the functional behavior and integrations built on top of those anchors.
Tasks
E3:S04:T01 – Establish expectations baseline for Numbering & Versioning package
Task ID: E3:S04:T01
Status: ✅ COMPLETE
Input: Package README, policy docs, implementation guides
Deliverable: Expectations baseline document
Approach: Extract expected behaviors, schemas, and constraints.
Version Anchor: ✅ COMPLETE (v0.3.4.1+1)
Acceptance Criteria:
- Expectations baseline documented and approved ✅
- Core operating principles captured ✅
- Expected versioning schema documented ✅
- Integration expectations mapped ✅
- Package composition documented ✅
- Sources referenced ✅
E3:S04:T02 – Inventory package components and map to expectations
Task ID: E3:S04:T02
Status: ✅ COMPLETE
Input: Package directory inventory
Deliverable: Component map with expected vs actual coverage
Approach: Map policies, templates, and examples to expectations.
Version Anchor: ✅ COMPLETE (v0.3.4.2+1)
Acceptance Criteria:
- Package directory fully inventoried ✅
- All components mapped to expectations ✅
- Component presence verified ✅
- Gaps identified and documented ✅
- Extras identified and documented ✅
- Component map created ✅
E3:S04:T03 – Validate versioning behavior against documented guidance
Task ID: E3:S04:T03
Status: ✅ COMPLETE
Input: Versioning policy and examples
Deliverable: Behavior validation notes and discrepancies
Approach: Validate schema rules, edge cases, and guidance consistency.
Version Anchor: ✅ COMPLETE (v0.3.4.3+1)
Acceptance Criteria:
- Schema rules validated against documented guidance ✅
- Edge cases validated against documented guidance ✅
- Guidance consistency checked across policy documents ✅
- Implementation validated against documented rules ✅
- Validation notes and discrepancies documented ✅
E3:S04:T04 – Review integrations and dependency alignment
Input: Integration references across Kanban and RW
Deliverable: Integration alignment report
Approach: Verify usage patterns across frameworks.
E3:S04:T05 – Create gap log and risk assessment
Input: Findings from T01–T04
Deliverable: Gap log with severity and risk notes
Approach: Consolidate gaps and categorize by RC impact.
E3:S04:T06 – Define RC sign-off criteria and remediation tasks
Input: Gap log and expected behaviors
Deliverable: RC sign-off checklist and remediation task list
Approach: Define minimum bar for RC and backlog tasks.
Acceptance Criteria
- Expectations baseline documented and approved. ✅ COMPLETE (v0.3.4.1+1)
- Component inventory mapped to expectations. ✅ COMPLETE (v0.3.4.2+1)
- Behavioral validation notes captured. ✅ COMPLETE (v0.3.4.3+1)
- Integration alignment reviewed and documented.
- Gap log created with severity levels.
- RC sign-off criteria and remediation tasks defined.
Dependencies
- None (RC readiness prerequisite for Epic 3 package sign-off).
References
- Package:
packages/frameworks/numbering & versioning/ - Versioning policies and templates within the package.