Skip to main content

Story 002 – Debug Path Package Installation Evaluation

Status: TODO
Priority: HIGH
Estimated Effort: [TBD]
Created: 2026-01-18
Last updated: 2026-01-18 (v0.11.2.0+0 – Story created)
Version: v0.11.2.0+0
Code: E11S02


Task Checklist

  • E11:S02:T01 – Enumerate supported installation paths for Debug Path - TODO
  • E11:S02:T02 – Validate fresh install steps for each path - TODO
  • E11:S02:T03 – Validate migration/update paths (if supported) - TODO
  • E11:S02:T04 – Verify post-install configuration and validation steps - TODO
  • E11:S02:T05 – Document failure modes and rollback guidance - TODO
  • E11:S02:T06 – Capture documentation gaps and improvements - TODO

Overview

This story evaluates all installation paths for the Debug Path framework package (packages/frameworks/debug-path/) to ensure each path is documented, reproducible, and RC-ready.


Goal

Provide a complete installation evaluation with step-by-step verification, gaps, and remediation tasks for RC sign-off.


Tasks

E11:S02:T01 – Enumerate supported installation paths for Debug Path

Input: Installation guides and scripts
Deliverable: Enumerated installation path list
Approach: Identify release, submodule, and CLI paths (as applicable).

E11:S02:T02 – Validate fresh install steps for each path

Input: Installation steps
Deliverable: Step-by-step validation log
Approach: Validate each step on a clean environment.

E11:S02:T03 – Validate migration/update paths (if supported)

Input: Migration/update guidance
Deliverable: Migration validation notes
Approach: Test upgrades and verify preserved behavior.

E11:S02:T04 – Verify post-install configuration and validation steps

Input: README and validation scripts
Deliverable: Post-install checklist and results
Approach: Verify configs, validators, and expected outputs.

E11:S02:T05 – Document failure modes and rollback guidance

Input: Installer behavior and logs
Deliverable: Failure mode list and rollback steps
Approach: Capture errors, troubleshooting, and recovery paths.

E11:S02:T06 – Capture documentation gaps and improvements

Input: Findings from T01–T05
Deliverable: Documentation gap list and remediation tasks
Approach: Record missing or unclear instructions.


Acceptance Criteria

  • Installation paths enumerated and verified.
  • Fresh install steps documented with results.
  • Migration/update steps validated or explicitly unsupported.
  • Post-install configuration checklist verified.
  • Failure modes and rollback guidance documented.
  • Documentation gaps recorded with remediation tasks.

Dependencies

  • None (RC readiness prerequisite for Epic 11 package sign-off).

References

  • Package: packages/frameworks/debug-path/