Repository Story Abstract Space Resolution - Migration Status
Status: IN PROGRESS
Priority: HIGH
Last updated: 2026-01-16
Related Work: E9:S01:T08 (Repository Story Abstract Space Contradiction)
Version: v0.9.1.8+1
Executive Summary
This document tracks the implementation status of the repository story abstract space resolution. The migration is being executed in phases, with Phase 1 (Perpetual Task Migration) complete and Phase 2 (Repository Story Migration) in progress.
Migration Phases
Phase 1: Perpetual Task Migration (T101+) ✅ COMPLETE
Status: ✅ COMPLETE
Completed: 2026-01-16
Changes:
-
E6:S06:T08 (UKW) → E6:S06:T101
- Task file renamed:
T08-update-kanban-workflow-ukw.md→T101-update-kanban-workflow-ukw.md - Task document updated with new Task ID (E6:S06:T101)
- Version updated:
v0.6.6.8+21→v0.6.6.101+21 - All references updated in task document
- Task file renamed:
-
E6:S06:T12 (CMW) → E6:S06:T102
- Task file renamed:
T12-changelog-maintenance-workflow-cmw.md→T102-changelog-maintenance-workflow-cmw.md - Task document updated with new Task ID (E6:S06:T102)
- Version updated:
v0.6.6.12+2→v0.6.6.102+2 - All references updated in task document
- Task file renamed:
Files Updated:
- ✅
docs/project-management/kanban/epics/Epic-6/Story-006-adk-implementation-analysis-and-package-management/T101-update-kanban-workflow-ukw.md - ✅
docs/project-management/kanban/epics/Epic-6/Story-006-adk-implementation-analysis-and-package-management/T102-changelog-maintenance-workflow-cmw.md - ✅
docs/project-management/kanban/epics/Epic-6/Story-006-adk-implementation-analysis-and-package-management.md(story checklist) - ✅
.cursorrules(UKW/CMW references) - ✅
docs/architecture/standards-and-adrs/dev-kit-versioning-policy.md(T101+ policy)
Validation:
- ✅ Task documents have correct Task IDs
- ✅ Story checklist updated
- ✅ Versioning policy documents T101+ range
- ✅
.cursorrulesreferences updated
Phase 2: Repository Story Migration (S00 → S01) 🔄 IN PROGRESS
Status: 🔄 IN PROGRESS
Started: 2026-01-16
Challenge: S01 is already taken in both Epic 5 and Epic 6:
- Epic 5: S01 = Documentation Maintenance Framework (IN PROGRESS)
- Epic 6: S01 = Framework Version Management (COMPLETE)
Solution: Renumber existing stories to free S01 for repositories:
- Epic 5: S01-S07 → S02-S08
- Epic 6: S01-S07 → S02-S08
Migration Steps:
- Renumber Epic 5 stories (S01-S07 → S02-S08)
- Renumber Epic 6 stories (S01-S07 → S02-S08)
- Create E5:S01 (FR Repo) story document
- Create E6:S01 (BR Repo) story document
- Migrate repository tasks (S00 → S01)
- Update S00 to abstract space only
- Update all references and version numbers
Current Status:
- ⏳ Story renumbering not yet started
- ⏳ Repository stories (S01) not yet created
- ⏳ Repository tasks not yet migrated
- ⏳ S00 not yet updated to abstract space only
Completed Components
Versioning System Updates ✅
- ✅ Versioning policy updated to support 3-digit tasks (T101+)
- ✅ Perpetual task range documented (T101+)
- ✅ Version parsing already supports 3-digit tasks (no code changes needed)
- ✅ Version comparison handles 3-digit tasks correctly
Perpetual Task Migration ✅
- ✅ UKW migrated from T08 to T101
- ✅ CMW migrated from T12 to T102
- ✅ All task documents updated
- ✅ Story checklist updated
- ✅
.cursorrulesupdated
Documentation Updates ✅
- ✅ Solution design document created
- ✅ Migration plan document created
- ✅ Versioning policy updated
- ✅ This status document created
Pending Components
Repository Story Migration ⏳
Epic 5:
- ⏳ Renumber S01-S07 → S02-S08
- ⏳ Create E5:S01 (FR Repo)
- ⏳ Migrate E5:S00 tasks (T31, T34, T35) → E5:S01
- ⏳ Update E5:S00 to abstract space only
Epic 6:
- ⏳ Renumber S01-S07 → S02-S08
- ⏳ Create E6:S01 (BR Repo)
- ⏳ Migrate E6:S00 tasks (T33) → E6:S01
- ⏳ Update E6:S00 to abstract space only
Policy Updates ⏳
- ⏳ Kanban governance policy (repository story pattern)
- ⏳ FR-018 (abstract space clarification)
- ⏳ FR-021 (repository story pattern update)
Reference Updates ⏳
- ⏳ All FR/BR documents (task ID updates)
- ⏳ All changelog entries (version number updates)
- ⏳ All cross-references in documentation
Next Steps
-
Renumber Epic 5 Stories (S01-S07 → S02-S08)
- Update Epic-5.md story checklist
- Rename story files
- Update all task documents
- Update all version numbers
- Update all references
-
Renumber Epic 6 Stories (S01-S07 → S02-S08)
- Update Epic-6.md story checklist
- Rename story files
- Update all task documents
- Update all version numbers
- Update all references
-
Create Repository Stories (S01)
- Create E5:S01 (FR Repo)
- Create E6:S01 (BR Repo)
-
Migrate Repository Tasks
- E5:S00 → E5:S01 (T31, T34, T35)
- E6:S00 → E6:S01 (T33)
-
Update S00 to Abstract Space
- Remove all task references
- Update descriptions
- Clarify Epic-level abstract space purpose
-
Update Policies and Documentation
- Kanban governance policy
- FR-018
- FR-021
- All cross-references
Risk Assessment
High Risk Areas:
- Story renumbering affects many files and references
- Version number updates must be comprehensive
- Cross-references must be updated accurately
Mitigation:
- Work systematically, one epic at a time
- Update references in batches
- Validate after each phase
- Use grep to find all references
Validation Checklist
Phase 1 (Perpetual Tasks) ✅
- Task files renamed correctly
- Task documents updated with new IDs
- Story checklist updated
- Versioning policy updated
-
.cursorrulesupdated
Phase 2 (Repository Stories) ⏳
- All stories renumbered correctly
- Repository stories (S01) created
- Repository tasks migrated
- S00 updated to abstract space only
- All version numbers updated
- All FR/BR documents updated
- All changelog entries updated
- All cross-references updated
- Policies updated
- All validators pass
References
- Solution Design:
docs/architecture/standards-and-adrs/repository-story-abstract-space-solution-design.md - Migration Plan:
docs/architecture/standards-and-adrs/repository-story-migration-plan.md - Task: E9:S01:T08 (Repository Story Abstract Space Contradiction)
- Versioning Policy:
docs/architecture/standards-and-adrs/dev-kit-versioning-policy.md
This status document is part of Epic 9: Release Candidate Readiness, Story 1: RC Readiness Gap Analysis. See Story-001-rc-readiness-gap-analysis.md for story context.